TEXAS · WELLS · WEBB COUNTY · API 42-479-35085 · DISTRICT 04

Hubberd Estate -C- #6

Plugged

Webb County · Bruni Ranch (Lobo) field  · Vertical

Hubberd Estate -C- #6 (API 42-479-35085) is a plugged well in Webb County, plugged November 13, 1996, last operated by Enron Oil & Gas Company.

The RRC has issued 2 drilling permits between 1990 and 1995, permitted to 9,650 ft.

Completion filings report 3 formation tops, including Wilcox, Lobo, Midway.

Its 2 leases have reported 240 barrels of oil and 26.1K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Enron Oil & Gas Company

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 4, 1998
Permits on file
2,825
Phone
(713) 853-7245

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnron Oil & Gas Company
Production reportsEnron Oil & Gas Companythrough Jun 1996
Latest permitEnron Oil & Gas CompanyJun 9, 1995
9,650
total depth, ft
2
permits on file
Jun 9, 1995
last permit issued
Aug 28, 1995
completed
240
cumulative oil, bbl
26.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 28, 1995
Shut in
—
Plugged
Nov 13, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hubberd Estate -C- G-4-155459Bruni Ranch (Lobo)Enron Oil & Gas Company101.76KAug 1995 – Jun 1996
Hubberd Estate C G-4-137022Liz (9200)Enron Oil & Gas Company124024.4KJan 1993 – Jun 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1993 → Jun 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
436725-99RecompletionEnron Oil & Gas CompanyJun 9, 1995Jun 9, 1995Jun 18, 19959,040
377362-99DrillEnron Oil & Gas CompanyAug 30, 1990Aug 30, 1990—9,650

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 28, 1995Hubberd Estate -C- G-4-155459Bruni Ranch (Lobo)Enron Oil & Gas CompanyPlugged—
Oct 2, 1990Hubberd Estate C G-4-137022Liz (9200)Enron Oil & Gas CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 450 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox4,387-3,937
Lobo8,460-8,010
Midway9,130-8,680

Perforations

Perforated and open-hole intervals.

FromToType
8,8428,965Perforated
9,0579,126Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00712.25345 S
77,0008.75300 S
2.8759,6006.25470 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 14, 1995Aug 31, 1995Yes
00Dec 8, 1995Oct 12, 1995—
00Oct 4, 1995——
00Apr 11, 1991Nov 8, 1990—
00Mar 13, 1991Oct 19, 1990Yes
00Mar 1, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47935085, documented in the API reference.