TEXAS · WELLS · WEBB COUNTY · VAQUILLAS RANCH A11 LEASE · API 42-479-35124 · DISTRICT 04
Vaquillas Ranch A11 #76
Webb County · Bonebrake (Lobo 6) field · Vertical
Vaquillas Ranch A11 #76 (API 42-479-35124) is a plugged well in Webb County, plugged April 14, 1997, last operated by Conoco Inc..
The RRC has issued one drilling permit, issued November 14, 1990, permitted to 10,400 ft.
Completion filings report 5 formation tops, including Queen City, L.W. Carrizo Wilcox, First Uncorfirmity, Lobo 6.
Its lease has reported 128 barrels of oil and 7.47K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 1, 2011
- Permits on file
- 4,644
- Phone
- (281) 293-5562
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Conoco Inc. |
| Production reports | Conoco Inc.through Sep 1994 |
| Latest permit | Conoco Inc.Nov 14, 1990 |
- 10,400
- total depth, ft
- 1
- permits on file
- Nov 14, 1990
- last permit issued
- Mar 9, 1991
- completed
- 128
- cumulative oil, bbl
- 7.47K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 9, 1991
- Shut in
- —
- Plugged
- Apr 14, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Vaquillas Ranch A11 G-4-138082 | Bonebrake (Lobo 6) | Conoco Inc. | 1 | 128 | 7.47K | Jan 1993 – Sep 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Conoco Inc.Jan 1993 → Sep 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 380894-99 | Drill | Conoco Inc. | Nov 9, 1990 | Nov 14, 1990 | Jan 3, 1991 | 10,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 9, 1991 | Vaquillas Ranch A11 G-4-138082 | Bonebrake (Lobo 6) | Conoco Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 581 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 2,610 | -2,029 |
| L.W. Carrizo Wilcox | 6,490 | -5,909 |
| First Uncorfirmity | 8,435 | -7,854 |
| Lobo 6 | 9,650 | -9,069 |
| MidwayMIDWAY SHALE | 9,830 | -9,249 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,620 | 9,630 | Perforated |
| 9,644 | 9,654 | Perforated |
| 9,770 | 9,780 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 531 | 12.5 | 200 S |
| 7 | 7,265 | 8.75 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 31, 1991 | Mar 27, 1991 | Yes |
| 00 | May 14, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-35124 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-35124 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47935124, documented in the API reference.