TEXAS · WELLS · WEBB COUNTY · LONG, ARCHIE LEASE · API 42-479-35236 · DISTRICT 04

Long Archie #307

Plugged

Webb County · Tom Walsh (Olmos) field  · Vertical

Fields on the latest permit · any of 2
Tom Walsh (Escondido) · Tom Walsh (Olmos)
Not one formation; the well must be completed in one of them, and no target formation is stated.

Long Archie #307 (API 42-479-35236) is a plugged well in Webb County, plugged May 29, 2018, last operated by Lewis Petro Properties Inc..

The RRC has issued one drilling permit, issued May 21, 1991, permitted to 7,400 ft.

Completion filings report one formation top, including Olmos.

Its lease has reported 509 barrels of oil and 155K mcf of gas since the record begins in January 1993, with no volume in the three years through August 2026.

Operator of record

Lewis Petro Properties Inc.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Jan 28, 2026
Permits on file
3,007
Phone
(210) 384-3200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLewis Petro Properties Inc.
Production reportsLewis Petro Properties, Inc.through Nov 2015
Latest permitLewis Petro Properties, Inc.May 21, 1991
7,400
total depth, ft
1
permits on file
May 21, 1991
last permit issued
Aug 6, 1991
completed
509
cumulative oil, bbl
155K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH NOV 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 6, 1991
Shut in
—
Plugged
May 29, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Long, Archie G-4-139429Tom Walsh (Olmos)Lewis Petro Properties, Inc.1509155Kby Jan 1993 – Nov 2015

No volumes reported on these leases in the last three years.

Wells named Long Archie

Lewis Petro Properties Inc.'s other wells filed under this lease name in Webb County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lewis Petro Properties, Inc.Jan 1993 → Nov 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
388006-99DrillLewis Petro Properties, Inc.May 16, 1991May 21, 1991—7,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 6, 1991Long Archie G-4-139429Tom Walsh (Olmos)Lewis Petro Properties Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 623 ft elevation.Download CSV →

FormationMD ftSubsea
OlmosOLMOS A7,114-6,491
OlmosOLMOS B7,230-6,607

Perforations

Perforated and open-hole intervals.

FromToType
7,1147,140Perforated
7,2307,238Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62578812.25335 S
4.57,0407.875895 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 27, 1991Sep 30, 1991Yes
00Oct 8, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47935236, documented in the API reference.