WELL · 42-479-36107 · DISTRICT 4

Hereford -T- #42

Plugged

Webb County · Hereford (Lobo) field  · Vertical

Hereford -T- #42 (API 42-479-36107) is a plugged well in Webb County, plugged November 28, 2005, last operated by Pogo Producing Company.

The RRC has issued one drilling permit, issued May 25, 1994, permitted to 7,700 ft.

It was permitted by Transtexas Gas Corporation and has since transferred to Pogo Producing Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Wills Point.

Operator of record

Pogo Producing Company

Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Jul 31, 2007
Permits on file
479
Phone
(713) 297-5000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePogo Producing Company
Production reportsNorth Central Oil Corp.through Jul 2005
Latest permitTranstexas Gas CorporationMay 25, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,700
total depth, ft
1
permits on file
May 25, 1994
last permit issued
Oct 8, 1996
completed
0
cumulative oil, bbl
2.79M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1994 THROUGH Nov 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 8, 1996
Shut in
—
Plugged
Nov 28, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hereford -T- G-4-151017Hereford (Lobo)North Central Oil Corp.102.79MJul 1994 – Nov 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationJul 1994 → May 1996
  2. 2North Central Oil Corp.Jun 1996 → Jul 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
424249-99DrillTranstexas Gas CorporationMay 25, 1994May 25, 1994May 29, 19947,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-151017————

Formation tops

As filed on W-2/G-1. Subsea from 524 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxTOP WILCOX3,431-2,907
Wilcox3,431-2,907
WilcoxBASE WILCOX4,651-4,127
Wills Point7,600-7,076

Perforations

Perforated and open-hole intervals.

FromToType
7,1687,200Perforated
7,1687,269Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62581812.25400 S
76,3118.75265 S
4.57,6986.125190 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 3, 1997Nov 10, 1997—
00Feb 20, 1997Nov 15, 1996—
00Oct 26, 1994Jul 29, 1994Yes
00Sep 29, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47936107, documented in the API reference.