TEXAS · WELLS · WEBB COUNTY · C-BRUNI MINERAL TRUST LEASE · API 42-479-36175 · DISTRICT 04

C-Bruni Mineral Trust #34

Y

Webb County · Bashara-Hereford (7300) field · Producing  · Vertical

C-Bruni Mineral Trust #34 (API 42-479-36175) is a well in Webb County operated by Hilcorp Energy Company, completed October 29, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 8, 1994, permitted to 9,000 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Lobo Unconformity, Willis Point, Cretaceous.

Its lease has reported 38.2K barrels of oil and 5.62M mcf of gas since October 1994, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitChevron U. S. A. Inc.Sep 8, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Sep 8, 1994
last permit issued
Oct 29, 1994
completed
38.2K
cumulative oil, bbl
5.62M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 29, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
C-Bruni Mineral Trust G-4-152405Bashara-Hereford (7300)Hilcorp Energy Company138.2K5.62MOct 1994 – Apr 2026

Gas, mcf lease total

Last 12 months 37,147 · prior 12 36,532(+2%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Oct 1994 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427847-99DrillChevron U. S. A. Inc.Sep 8, 1994Sep 8, 1994Oct 8, 19949,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 29, 1994C-Bruni Mineral Trust G-4-152405Bashara-Hereford (7300)Hilcorp Energy CompanyProducing9,000

Formation tops

As filed on W-2/G-1. Subsea from 493 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo Unconformity6,673-6,180
Willis Point7,420-6,927
Cretaceous8,295-7,802

Perforations

Perforated and open-hole intervals.

FromToType
7,1507,178Perforated
7,1867,199Perforated
7,2037,205Perforated
7,2367,238Perforated
7,2417,242Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00712.25350 S
76,2188.75250 S
4.59,0006.125350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 27, 1995Nov 18, 1994Yes
00Jan 27, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47936175, documented in the API reference.