TEXAS · WELLS · WEBB COUNTY · VERGARA LEASE · API 42-479-36433 · DISTRICT 04

Vergara #13

Plugged

Webb County · Vaquillas Ranch (Lobo Cons.) field  · Vertical

Vergara #13 (API 42-479-36433) is a plugged well in Webb County, plugged October 24, 2003, last operated by Conocophillips Company.

The RRC has issued one drilling permit, issued January 31, 1996, permitted to 10,100 ft.

It was permitted by Transtexas Gas Corporation and has since transferred to Conocophillips Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Wills Point.

Its lease has reported 6.37K barrels of oil and 564K mcf of gas since March 1996, with no volume in the three years through April 2026.

Operator of record

Conocophillips Company

Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Feb 3, 2026
Permits on file
3,290
Phone
(432) 683-7443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleConocophillips Company
Production reportsConocophillips Companythrough Jul 2003
Latest permitTranstexas Gas CorporationJan 31, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,100
total depth, ft
1
permits on file
Jan 31, 1996
last permit issued
Mar 13, 1996
completed
6.37K
cumulative oil, bbl
564K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 13, 1996
Shut in
—
Plugged
Oct 24, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vergara G-4-157557Vaquillas Ranch (Lobo Cons.)Conocophillips Company16.37K564KMar 1996 – Jul 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationMar 1996 → May 1997
  2. 2Conoco Inc.Jun 1997 → Dec 2002
  3. 3Conocophillips CompanyJan 2003 → Jul 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
444320-99DrillTranstexas Gas CorporationJan 31, 1996Jan 31, 1996Feb 7, 199610,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 13, 1996Vergara G-4-157557Vaquillas Ranch (Lobo Cons.)Conocophillips CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 607 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox5,278-4,671
WilcoxBASE LOWER WILCOX7,157-6,550
WilcoxBASE WILCOX WILCOX7,157-6,550
Wills Point9,900-9,293

Perforations

Perforated and open-hole intervals.

FromToType
9,4029,684Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62575012.25350 S
77,9058.75340 S
4.510,0496.125285 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 3, 1996Jun 3, 1996—
00May 29, 1996Apr 2, 1996Yes
00Apr 11, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47936433, documented in the API reference.