TEXAS · WELLS · WEBB COUNTY · HEREFORD -T- LEASE · API 42-479-37222 · DISTRICT 04

Hereford -T- #51

Shut in

Webb County · Bashara-Hereford (7300) field · Temp Abandoned  · Vertical

Hereford -T- #51 (API 42-479-37222) is a well in Webb County operated by Merit Energy Company, completed April 8, 1999 and listed as temp abandoned on the RRC schedule, shut in March 1, 2009.

The RRC has issued one drilling permit, issued January 27, 1999, permitted to 7,400 ft.

It was permitted by North Central Oil Corp. and has since transferred to Merit Energy Company on the wellbore schedule.

Completion filings report one formation top, including Lobo 1.

Its lease has reported 191 barrels of oil and 137K mcf of gas since April 1999, with no volume in the three years through April 2026.

Operator of record

Merit Energy Company

Permitted by North Central Oil Corp.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 7, 2025
Permits on file
1,049
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsMerit Energy Companythrough Mar 2012
Latest permitNorth Central Oil Corp.Jan 27, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,400
total depth, ft
1
permits on file
Jan 27, 1999
last permit issued
Apr 8, 1999
completed
191
cumulative oil, bbl
137K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1999 THROUGH Mar 2012

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 8, 1999
Shut in
Mar 1, 2009
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hereford -T- G-4-173097Bashara-Hereford (7300)Merit Energy Company1191137KApr 1999 – Mar 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1North Central Oil Corp.Apr 1999 → Dec 2005
  2. 2Pogo Producing CompanyJan 2006 → Dec 2007
  3. 3Pogo Producing Company LLCFeb 2008 → Feb 2009
  4. 4OXY USA Inc.Mar 2012 → Mar 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
482299-99DrillNorth Central Oil Corp.Jan 27, 1999Jan 27, 1999Mar 21, 19997,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 8, 1999Hereford -T- G-4-173097Bashara-Hereford (7300)Merit Energy CompanyTemp Abandoned · shut in Mar 1, 20097,400

Formation tops

As filed on W-2/G-1. Subsea from 442 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo 17,085-6,643

Perforations

Perforated and open-hole intervals.

FromToType
7,0907,118Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62592012.5342 S
75,6958.75288 S
3.57,4006.25255 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 19, 1999Jul 6, 1999—
00Jun 29, 1999Jun 2, 1999Yes
00Jun 14, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47937222, documented in the API reference.