TEXAS · WELLS · WEBB COUNTY · VELA, J.M. LEASE · API 42-479-38629 · DISTRICT 04

Vela J.M. #14

Y

Webb County · Bashara-Hereford (7300) field · Producing  · Directional

Vela J.M. #14 (API 42-479-38629) is a well in Webb County operated by Hilcorp Energy Company, completed March 29, 2004 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 4, 2004, permitted to 9,250 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including Bashara-Hereford (7300).

Its lease has reported 6.97K barrels of oil and 4.69M mcf of gas since March 2004, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitChevron U. S. A. Inc.Feb 4, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,250
total depth, ft
1
permits on file
Feb 4, 2004
last permit issued
Mar 29, 2004
completed
6.97K
cumulative oil, bbl
4.69M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 29, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vela, J.M. G-4-201079Bashara-Hereford (7300)Hilcorp Energy Company16.97K4.69MMar 2004 – Apr 2026

Gas, mcf lease total

Last 12 months 71,125 · prior 12 75,681(-6%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Mar 2004 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541627-99DrillChevron U. S. A. Inc.Feb 4, 2004Feb 4, 2004Feb 16, 200410,050

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 29, 2004Vela J.M. G-4-201079Bashara-Hereford (7300)Hilcorp Energy CompanyProducing9,250

Formation tops

As filed on W-2/G-1. Subsea from 391 ft elevation.Download CSV →

FormationMD ftSubsea
Bashara-Hereford (7300)8,581-8,190

Perforations

Perforated and open-hole intervals.

FromToType
8,4798,588Perforated
8,4938,611Perforated
8,5818,588Perforated
8,5978,611Perforated
8,9079,073Perforated
9,0709,073Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62599712.25375 S
76,7008.5240 S
2.8759,2506.25405 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 5, 2012Apr 4, 2012—
00Jul 1, 2004Apr 19, 2004Yes
00May 20, 2004——

Well logs

1 log loaded from the RRC's log index, the latest received Jun 25, 2007. Density, Gamma ray, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
Combination: Resistivity/Neutron Density PorosityARRAY INDUCTION GR LITHODENSITY COMPENSATED NEUTRON PLATFORM EXPRESS 150Spans Bashara-Hereford (7300)TIFF90 to 9,269Jun 25, 2007run Feb 29, 2004—

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47938629, documented in the API reference.