WELL · 42-479-38630 · DISTRICT 4
DE la Garza Lolita Benavides #1
Webb County · Tiffany (Wilcox Carrizo) field · Vertical
De La Garza Lolita Benavides #1 (API 42-479-38630) is a plugged well in Webb County, plugged August 10, 2021, last operated by Columbus Energy LLC.
The RRC has issued one drilling permit, issued February 4, 2004, permitted to 12,500 ft.
It was permitted by Royal Production Company, Inc. and has since transferred to Columbus Energy LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Queen City, Wilcox, 5th Hinnant.
Operator of record
Permitted by Royal Production Company, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 2, 2026
- Permits on file
- 51
- Phone
- (832) 432-8540
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Columbus Energy LLC |
| Production reports | Dakota Oil Companythrough Oct 2010 |
| Latest permit | Royal Production Company, Inc.Feb 4, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 1
- permits on file
- Feb 4, 2004
- last permit issued
- Mar 8, 2004
- completed
- 0
- cumulative oil, bbl
- 538K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Aug 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 8, 2004
- Shut in
- —
- Plugged
- Aug 10, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| DE la Garza, Lolita Benavides G-4-201251 | Tiffany (Wilcox Carrizo) | Columbus Energy, LLC | 1 | 0 | 538K | Mar 2004 – Aug 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Royal Production Company, Inc.Mar 2004 → Jul 2005
- 2Riddle Engineering Corp.Sep 2005 → Aug 2006
- 3Dakota Oil CompanySep 2006 → Oct 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 541658-99 | Drill | Royal Production Company, Inc. | Feb 4, 2004 | Feb 4, 2004 | Feb 7, 2004 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-201251 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 856 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 5,450 | -4,594 |
| WilcoxTOP WILCOX | 7,910 | -7,054 |
| 5TH Hinnant | 9,050 | -8,194 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,792 | 11,876 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 600 | 12.25 | 240 S |
| 7 | 9,935 | 8.75 | 245 S |
| 4.5 | 12,036 | 6.25 | 280 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 13, 2004 | May 3, 2004 | Yes |
| 00 | May 28, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-38630 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-38630 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47938630, documented in the API reference.