WELL · 42-479-39703 · DISTRICT 4

State-Running W 598 #2

Y

Webb County · Charro (9100) field · Producing  · Vertical

State-Running W 598 #2 (API 42-479-39703) is a well in Webb County operated by Hilcorp Energy Company, completed January 22, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued November 20, 2006, permitted to 10,000 ft.

It was permitted by Ricochet Energy, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Ricochet Energy, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitRicochet Energy, Inc.Nov 20, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
1
permits on file
Nov 20, 2006
last permit issued
Jan 22, 2007
completed
0
cumulative oil, bbl
1.06M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 22, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State-Running "W" 598 G-4-224610Charro (9100)Hilcorp Energy Company101.06MJan 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 22,817 · prior 12 24,259(-6%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ricochet Energy, Inc.Jan 2007 → Oct 2013
  2. 2Hilcorp Energy CompanyNov 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
629266-99DrillRicochet Energy, Inc.Nov 17, 2006Nov 20, 2006Nov 24, 200610,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-224610————

Perforations

Perforated and open-hole intervals.

FromToType
9,4129,422Perforated
9,4359,440Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7530014.75273 S
7.6257,8009.875418 S
4.59,6776.75295 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 2007Feb 9, 2007Yes
00Feb 16, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47939703, documented in the API reference.