TEXAS · WELLS · WEBB COUNTY · WORTHEY RANCH LEASE · API 42-479-40941 · DISTRICT 01

Worthey Ranch #2H

Y

Webb County · Briscoe Ranch (Eagleford) field · Producing  · Horizontal

Worthey Ranch #2H (API 42-479-40941) is a horizontal well in Webb County operated by Javelin Energy Partners Mgmt LLC, completed September 24, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 2, 2010, permitted to 8,492 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.

Completion filings report 3 formation tops, including San Miguel, Austin Chalk, Eagle Ford.

No lease production has been reported under this well’s leases.

Operator of record

Javelin Energy Partners Mgmt LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 24, 2026
Permits on file
233
Phone
(469) 575-3800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJavelin Energy Partners Mgmt LLC
Production reportsJavelin Energy Partners Mgmt LLCthrough Apr 2026
Latest permitAnadarko E&P Company LPJun 2, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,492
total depth, ft
1
permits on file
Jun 2, 2010
last permit issued
Sep 24, 2010
completed
0
cumulative oil, bbl
2.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 24, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Worthey Ranch G-1-258667Briscoe Ranch (Eagleford)Javelin Energy Partners Mgmt LLC102.17MSep 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 66,920 · prior 12 72,386(-8%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPSep 2010 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Feb 2017
  3. 3SN EF Maverick, LLCMar 2017 → Aug 2023
  4. 4Javelin Energy Partners Mgmt LLCSep 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
696840-99DrillAnadarko E&P Company LPJun 1, 2010Jun 2, 2010Jul 15, 20109,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 24, 2010Worthey Ranch G-1-258667Briscoe Ranch (Eagleford)Javelin Energy Partners Mgmt LLCProducing8,492

Formation tops

As filed on W-2/G-1. Subsea from 575 ft elevation.Download CSV →

FormationMD ftSubsea
San Miguel6,129-5,554
Austin Chalk7,899-7,324
Eagle FordEAGLEFORD8,285-7,710

Perforations

Perforated and open-hole intervals.

FromToType
9,22013,843Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,68512.251,126 S
5.513,9768.753,192 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 29, 2011Nov 10, 2010Yes
00Jan 25, 2011Sep 29, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47940941, documented in the API reference.