TEXAS · WELLS · WEBB COUNTY · LENORE LEASE · API 42-479-41056 · DISTRICT 04

Lenore #1

Plugged

Webb County · Davis S. (5500) field  · Vertical

Lenore #1 (API 42-479-41056) is a plugged well in Webb County, plugged March 16, 2022, last operated by Killam Oil CO. Ltd..

The RRC has issued one drilling permit, issued September 24, 2010, permitted to 7,000 ft.

Completion filings report 5 formation tops, including Mirando, Yegua, Crockett, Queen City.

Operator of record

Killam Oil Co. Ltd.

Based in
Laredo, TX
P-5 status
Active (A)
P-5 last filed
Apr 9, 2026
Permits on file
837
Phone
(956) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Co. Ltd.
Production reportsKillam Oil Co., Ltd.through Jan 2020
Latest permitKillam Oil Co., Ltd.Sep 24, 2010
7,000
total depth, ft
1
permits on file
Sep 24, 2010
last permit issued
Aug 14, 2019
completed
0
cumulative oil, bbl
909K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Nov 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 14, 2019
Shut in
—
Plugged
Mar 16, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lenore G-4-262352Davis, S. (5500)Killam Oil Co., Ltd.10909KMar 2011 – Nov 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Killam Oil Co., Ltd.Jun 2011 → Jan 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
702588-99DrillKillam Oil Co., Ltd.Sep 22, 2010Sep 24, 2010Feb 6, 20117,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 14, 2019Lenore G-4-262352Davis S. (5500)Killam Oil Co. Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 850 ft elevation.Download CSV →

FormationMD ftSubsea
Mirando1,535-685
Yegua2,060-1,210
Crockett3,865-3,015
Queen CityTOP OF QUEEN CITY4,660-3,810
Queen City4TH QUEEN CITY5,237-4,387
Carlos5,923-5,073

Perforations

Perforated and open-hole intervals.

FromToType
5,4285,432Perforated
5,5085,511Perforated
5,5905,592Perforated
5,6085,610Perforated
5,6405,646Perforated
5,6805,685Perforated
5,7315,734Perforated
5,7375,740Perforated
5,9245,929Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62569412.25355 S
4.56,4807.875531 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 11, 2019Aug 28, 2019—
00Dec 21, 2018Oct 26, 2018—
00Jun 7, 2018May 21, 2018—
00Sep 27, 2017Sep 6, 2017—
00Nov 15, 2016Nov 1, 2016—
00Mar 25, 2014Feb 28, 2014—
00Mar 1, 2012Sep 16, 2011—
00Feb 29, 2012Aug 25, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47941056, documented in the API reference.