WELL · 42-479-42602 · DISTRICT 4

Rosario Cattle Company #4

N

Webb County · Cuba Libre (3RD Hinnant) field  · Directional

Rosario Cattle Company #4 (API 42-479-42602) is a well in Webb County operated by Blackbeard Operating LLC, completed January 8, 2014.

The RRC has issued one drilling permit, issued October 26, 2013, permitted to 9,500 ft.

It was permitted by Bluestone Natural Res. II, LLC and has since transferred to Blackbeard Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Queen City, Reklaw, Puig.

Its 2 leases have reported 1.02K barrels of oil and 36.7K mcf of gas since January 2014, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Blackbeard Operating LLC

Permitted by Bluestone Natural Res. II, LLC; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
2,263
Phone
(432) 242-0050

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlackbeard Operating LLC
Production reportsVaras Energy Operating Company,through Apr 2026
Latest permitBluestone Natural Res. II, LLCOct 26, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,500
total depth, ft
1
permits on file
Oct 26, 2013
last permit issued
Jan 8, 2014
completed
1.02K
cumulative oil, bbl
36.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 8, 2014
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rosario Cattle Company G-4-282162Cuba Libre (3RD Hinnant)Varas Energy Operating Company,104.53KMar 2017 – Jul 2026
Rosario Cattle Company O-4-13890Cuba Libre (3RD Hinnant)Blackbeard Operating, LLC11.02K32.1KJan 2014 – Mar 2020

Gas, mcf lease total

Last 12 months 595 · prior 12 250(+138%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bluestone Natural Res. II, LLCJan 2014 → Dec 2019
  2. 2Blackbeard Operating, LLCJan 2020 → Nov 2020
  3. 3Hugoton Operating Company, Inc.Dec 2020 → Jul 2024
  4. 4Varas Energy Operating Company,Jan 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
772151-99DrillBluestone Natural Res. II, LLCOct 21, 2013Oct 26, 2013Nov 9, 20139,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-282162————
—— O-4-13890————

Formation tops

As filed on W-2/G-1. Subsea from 830 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City5,209-4,379
Reklaw6,702-5,872
Puig8,630-7,800

Perforations

Perforated and open-hole intervals.

FromToType
8,3248,350Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,25012.25646 S
5.59,1008.429375 S
5.59,1008.75375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 5, 2017Apr 11, 2017—
00Feb 13, 2015Feb 27, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47942602, documented in the API reference.