TEXAS · WELLS · WEBB COUNTY · BOOTH UNOCAL H LEASE · API 42-479-42683 · DISTRICT 01

Booth Unocal H #67U

Y

Webb County · Hawkville (Eagleford Shale) field · Producing  · Horizontal

Booth Unocal H #67U (API 42-479-42683) is a horizontal well in Webb County operated by Lewis Petro Properties Inc., completed August 4, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 27, 2014, permitted to 9,476 ft.

Completion filings report 10 formation tops, including Queen City, Wilcox, Escondido, Olmos.

Its lease has reported 6.88K barrels of oil and 3.05M mcf of gas since August 2014, last reporting volume in April 2026.

Operator of record

Lewis Petro Properties Inc.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Jan 28, 2026
Permits on file
3,007
Phone
(210) 384-3200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLewis Petro Properties Inc.
Production reportsLewis Petro Properties, Inc.through Apr 2026
Latest permitLewis Petro Properties, Inc.Jan 27, 2014
9,476
total depth, ft
1
permits on file
Jan 27, 2014
last permit issued
Aug 4, 2014
completed
6.88K
cumulative oil, bbl
3.05M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2014 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 4, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Booth Unocal H G-1-275798Hawkville (Eagleford Shale)Lewis Petro Properties, Inc.16.88K3.05MAug 2014 – Apr 2026

Gas, mcf lease total

Last 12 months 97,543 · prior 12 129,731(-25%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lewis Petro Properties, Inc.Aug 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
777540-99DrillLewis Petro Properties, Inc.Jan 17, 2014Jan 27, 2014Feb 2, 201417,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 4, 2014Booth Unocal H G-1-275798Hawkville (Eagleford Shale)Lewis Petro Properties Inc.Producing9,476

Formation tops

As filed on W-2/G-1. Subsea from 664 ft elevation.Download CSV →

FormationMD ftSubsea
Queen CityQUEEN CITY - INJECTION/DISPOSAL;900-236
WilcoxWILCOX - INJECTION/DISPOSAL1,800-1,136
EscondidoESCONDITO - INJECTION/DISPOSAL;2,300-1,636
OlmosOLMOS - INJECTION/DISPOSAL6,435-5,771
Eagle FordEAGLE FORD SHALE9,355-8,691
CatahoulaCATAHOULA-FRIO - INJECTION/DISPO——
Cook Mountain——
EdwardsEDWARDS LIMESTONE - H2S——
JacksonJACKSON - INJECTION/DISPOSAL——
YeguaYEGUA - INJECTION/DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
9,91414,720Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,31012.25625 S
5.58,5058.752,895 S
4.514,8418.752,895 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 17, 2015Jan 7, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47942683, documented in the API reference.