TEXAS · WELLS · WHARTON COUNTY · API 42-481-30679 · DISTRICT 03

Pierce Estates #C195

Plugged

Wharton County · Withers North (-a- Sand) field  · Vertical

Pierce Estates #C195 (API 42-481-30679) is a plugged well in Wharton County, plugged November 3, 2006, last operated by Apache Corporation.

The RRC has issued 3 drilling permits (amended once) between 1983 and 1995, permitted to 5,500 ft.

Its 2 leases have reported 6.24K barrels of oil and 186 mcf of gas since January 1993, last reporting in December 2006. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Apache Corporation

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco Inc.
Production reportsApache Corporationthrough Dec 1995
Latest permitApache CorporationOct 2, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
4
permits on file
Oct 2, 1995
last permit issued
Sep 7, 1995
completed
6.24K
cumulative oil, bbl
186
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 7, 1995
Shut in
—
Plugged
Nov 3, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pierce Estates O-3-19954Withers, North (AX Sand)Apache Corporation46.24K186Jan 1993 – Dec 2006
Pierce Estates G-3-155546Withers, North (-a- Sand)Apache Corporation100Sep 1995 – Nov 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Oct 1994
  2. 2Apache CorporationMar 1995 → Dec 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
440393-99RecompletionApache CorporationSep 29, 1995Oct 2, 1995Aug 30, 19955,248
325294-98RecompletionTexaco Inc.Jan 7, 1988Feb 11, 1987—5,500
325294-99RecompletionTexaco Inc.Jan 12, 1987Feb 11, 1987—5,500
195385-99RecompletionTexaco Inc.May 17, 1983May 17, 1983—5,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 7, 1995Pierce Estates G-3-155546Withers North (-a- Sand)Apache CorporationPlugged—
Apr 9, 1987Pierce Estates O-3-19954Withers North (AX Sand)Apache CorporationPlugged—
Apr 9, 1987Pierce Estates O-3-6719Withers NorthRemora Management LLCPlugged—
May 18, 1983Pierce Estates G-3-105589Withers North (East 4000)Texaco Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,9713,975Perforated
5,2325,235Perforated
5,2635,271Perforated
5,2745,279Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,25015650 S
10.751,25115650 S
10.751,251——
2.3753,822——
2.3755,260——
4.55,5008.75630 S
4.55,500—630 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 8, 1995Sep 28, 1995Yes
00Oct 10, 1995——
00Feb 3, 1988May 6, 1987—
00Jan 28, 1988——
00Jul 16, 1987May 11, 1987Yes
00Jan 12, 1984Jun 2, 1983—
00Jan 12, 1984Aug 26, 1974—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48130679, documented in the API reference.