WELL · 42-481-31700 · DISTRICT 3
Badger Unit #1
Wharton County · Bernard East (7510) field · Vertical
Badger Unit #1 (API 42-481-31700) is a plugged well in Wharton County, plugged October 28, 1985, last operated by Sue-Ann Oil & Gas Company.
The RRC has issued 3 drilling permits between 1978 and 1984, permitted to 7,812 ft.
Completion filings report 4 formation tops, including Yegua, Clodine Sand, Mcgalliard Sand, 7510 Sand.
Operator of record
- Based in
- Victoria, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 28, 1991
- Permits on file
- 215
- Phone
- (512) 576-6090
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sue-Ann Oil & Gas Company |
| Production reports | none |
| Latest permit | Sue-Ann Oil & Gas CompanyApr 3, 1984 |
- 7,812
- total depth, ft
- 3
- permits on file
- Apr 3, 1984
- last permit issued
- Nov 18, 1983
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 18, 1983
- Shut in
- —
- Plugged
- Oct 28, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 234417-99 | Recompletion | Sue-Ann Oil & Gas Company | Apr 19, 1984 | Apr 3, 1984 | — | 7,812 |
| 219660-99 | Other | Sue-Ann Oil & Gas Company | Oct 31, 1983 | Nov 3, 1983 | — | 7,812 |
| 35665-99 | Drill | Cameron, Paul E., Jr., Inc. | Oct 26, 1978 | Oct 26, 1978 | Oct 27, 1978 | 7,800 |
Formation tops
As filed on W-2/G-1. Subsea from 123 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| YeguaTOP OF YEGUA | 6,930 | -6,807 |
| Clodine Sand | 7,162 | -7,039 |
| McGalliard Sand | 7,290 | -7,167 |
| 7510 Sand | 7,509 | -7,386 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,157 | 7,512 | Perforated |
| 7,292 | 7,298 | Perforated |
| 7,509 | 7,512 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 943 | 12.25 | 490 S |
| 2.375 | 6,944 | — | — |
| 4.5 | 7,795 | 7.875 | 1,800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 25, 1984 | May 11, 1984 | — |
| 00 | May 19, 1984 | May 11, 1984 | — |
| 00 | Jan 20, 1984 | Dec 1, 1983 | — |
| 00 | Jan 12, 1984 | Feb 2, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-31700 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-31700 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48131700, documented in the API reference.