TEXAS · WELLS · WHARTON COUNTY · API 42-481-32492 · DISTRICT 03
Rainoshek-Garner Gas Unit #4
Wharton County · Louise North (2600) field · Vertical
- Fields on the latest permit · any of 3
- Louise,north (2600) · Louise North (2790) · Louise, North (2800)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Rainoshek-Garner Gas Unit #4 (API 42-481-32492) is a plugged well in Wharton County, plugged April 12, 1988, last operated by Txo Production Corp..
The RRC has issued 2 drilling permits in 1983, permitted to 3,200 ft.
Completion filings report one formation top, including Miocene (undifferentiated).
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 2, 1990
- Permits on file
- 3,227
- Phone
- (214) 954-2086
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TXO Production Corp. |
| Production reports | none |
| Latest permit | TXO Production Corp.Jul 28, 1983 |
- 3,200
- total depth, ft
- 2
- permits on file
- Jul 28, 1983
- last permit issued
- Feb 17, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 17, 1984
- Shut in
- —
- Plugged
- Apr 12, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Wells named Rainoshek-Garner Gas Unit
TXO Production Corp.'s other wells filed under this lease name in Wharton County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsPermits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 203179-99 | Recompletion | TXO Production Corp. | Jul 28, 1983 | Jul 28, 1983 | — | 3,200 |
| 192637-99 | Drill | TXO Production Corp. | Apr 25, 1983 | Apr 25, 1983 | — | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 17, 1984 | Rainoshek-Garner Gas Unit G-3-109360 | Louise North (2600) | TXO Production Corp. | Plugged | — |
| May 11, 1983 | Rainoshek-Garner Gas Unit G-3-105912 | Louise North (2840) | TXO Production Corp. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 107 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1 | 106 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,610 | 2,616 | Perforated |
| 2,844 | 2,848 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 434 | 12.25 | 275 S |
| 2.375 | 2,752 | — | — |
| 4.5 | 3,025 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 6, 1984 | Feb 24, 1984 | — |
| 00 | Mar 15, 1984 | Feb 24, 1984 | — |
| 00 | Jan 12, 1984 | May 24, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-32492 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-32492 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48132492, documented in the API reference.