WELL · 42-481-32537 · DISTRICT 3

Wilson X #1

Plugged

Wharton County · New Taiton (7215) field  · Vertical

Wilson X #1 (API 42-481-32537) is a plugged well in Wharton County, plugged January 25, 1989, last operated by Txo Production Corp..

The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 7,800 ft.

Completion filings report 2 formation tops, including Frio, Yegua.

Operator of record

TXO Production Corp.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
3,227
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsnone
Latest permitTXO Production Corp.Aug 9, 1984
7,800
total depth, ft
2
permits on file
Aug 9, 1984
last permit issued
Jan 6, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 6, 1984
Shut in
—
Plugged
Jan 25, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
247724-99RecompletionTXO Production Corp.Aug 7, 1984Aug 9, 1984—7,800
205344-99DrillTXO Production Corp.Aug 5, 1983Aug 12, 1983—7,800

Formation tops

As filed on W-2/G-1. Subsea from 139 ft elevation.Download CSV →

FormationMD ftSubsea
Frio1138
YeguaTOP OF YEGUA6,780-6,641

Perforations

Perforated and open-hole intervals.

FromToType
4,0344,038Perforated
7,2147,222Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,82612.25750 S
2.8757,5147.8751,260 S
2.8757,7187.8751,260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 6, 1987Oct 12, 1987Yes
00Sep 26, 1984Sep 4, 1984—
00Sep 22, 1984Sep 4, 1984—
00Mar 26, 1984Jan 23, 1984—
00Mar 15, 1984Jan 23, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48132537, documented in the API reference.