TEXAS · WELLS · WHARTON COUNTY · API 42-481-34000 · DISTRICT 03

Hollimon Oil Corp. #1

Plugged

Wharton County · Jones CRK field  · Vertical

Fields on the latest permit · any of 9
Jones Creek (3100) · Jones Creek (3400) · Jones Creek (4200 Frio) · Field 47127327 · Jones Creek (4800) · Jones Creek (5150) · Jones Creek (5200 Frio) · Jones Creek (5300) · Jones Creek, N. (5050)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Hollimon Oil Corp. #1 (API 42-481-34000) is a plugged well in Wharton County, plugged November 17, 1997, last operated by Fucik Unit.

The RRC has issued one drilling permit, issued October 3, 1997, permitted to 5,600 ft.

It was permitted by Hollimon Oil Corporation and has since transferred to Fucik Unit on the wellbore schedule.

Operator of record

Fucik Unit

Permitted by Hollimon Oil Corporation; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHollimon Oil CorporationOct 3, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,600
total depth, ft
1
permits on file
Oct 3, 1997
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 17, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
467889-99DrillHollimon Oil CorporationSep 22, 1997Oct 3, 1997Nov 6, 19975,600

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48134000, documented in the API reference.