TEXAS · WELLS · WHARTON COUNTY · API 42-481-34441 · DISTRICT 03

Sand Ridge Baptist Church #1

N

Wharton County  · Vertical

Sand Ridge Baptist Church #1 (API 42-481-34441) is a permitted well in Wharton County filed by El Paso Production Oil & Gas CO.; no completion report is on file yet.

The RRC has issued one drilling permit, issued April 29, 2002, permitted to 14,000 ft.

Operator of record

El Paso Production Oil & Gas Co.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 30, 2016
Permits on file
616
Phone
(713) 420-2600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitEl Paso Production Oil & Gas Co.Apr 29, 2002
14,000
total depth, ft
1
permits on file
Apr 29, 2002
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
519509-99DrillEl Paso Production Oil & Gas Co.Apr 29, 2002Apr 29, 2002—14,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48134441, documented in the API reference.