WELL · 42-483-30481 · DISTRICT 10

Tipps SWD #1

WaterPlugged

Wheeler County  · Vertical

Tipps Swd #1 (API 42-483-30481) is a plugged well in Wheeler County, plugged September 19, 1991, last operated by Overflow Energy, LLC.

The RRC has issued 4 drilling permits between 1977 and 2013, permitted to 12,200 ft.

Completion filings report 12 formation tops, including Brown Dolomite, Heebner, Douglas, Tonkawa.

It holds an active disposal or injection permit, with 811K barrels injected in the 12 months reported through June 2025.

Operator of record

Overflow Energy, LLC

Perryton, TX · P-5 Y, filed Aug 4, 2025 · 47 permits on file · (806) 202-7697

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitOverflow Energy, LLCSep 17, 2013
12,200
total depth, ft
4
permits on file
Sep 17, 2013
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 19, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tipps SWD O-14-9486Buffalo Wallow (Granite Wash)Overflow Energy, LLC100Nov 2014 – Jul 2026
— G-14-132565——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
770121-99ReenterOverflow Energy, LLCSep 17, 2013Sep 17, 2013Sep 23, 20146,550
712318-99ReenterOverflow Energy, LLCMar 17, 2011Mar 24, 2011—6,500
351605-99ReenterSamson Resources CompanySep 26, 1988Sep 26, 1988—12,200
14140-99DrillSmith, Earl T. & Assoc., Inc.Dec 15, 1977Dec 15, 1977Dec 14, 19776,038

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-132565————
—— O-14-9486————

Formation tops

As filed on W-2/G-1. Subsea from 2,678 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite4,567-1,889
Brown DolomiteBROWN DOLOMITE (UPPER) - PANHAND4,567-1,889
Heebner8,330-5,652
Douglas8,335-5,657
Tonkawa9,210-6,532
Cleveland10,200-7,522
Granite Wash10,375-7,697
Blaine - Pressured (Artisian) AN——
Brown DolomiteBROWN DOLOMITE (LOWER) - PRESSUR——
Douglas——
GlorietaGLORIETA - OLD WATERFLOOD; CORRO——
Granite Washe - Panhandle Field——
Granite Washes——
PennsylvanianPENNSYLVANIAN SHALE——
Tonkawa——
Wichita-AlbanyWICHITA DOLOMITE——

Perforations

Perforated and open-hole intervals.

FromToType
4,6044,624Perforated
4,6624,682Perforated
4,7024,725Perforated
4,7604,780Perforated
4,8004,820Perforated
11,79611,887Perforated
11,97212,052Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,508—1,800 S
9.6253,52414.753,300 S
74,6367.25250 S
4.512,2165.875140 S
714,494——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 10, 2018May 20, 2015—
00Oct 4, 2016——
00Dec 15, 1989Aug 21, 1989—
00Dec 9, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

811K
bbl, last 12 reported months
7.41M
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104732W-14 DisposalActive10,0001,0004,520–6,430

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 810,728 · prior 12 769,881(+5%)

050K100K150K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48330481, documented in the API reference.