WELL · 42-483-30608 · DISTRICT 10
Killingsworth, C. O. #1
Wheeler County · Vertical
Killingsworth, C. O. #1 (API 42-483-30608) is a permitted well in Wheeler County filed by Chevron U. S. A. Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1978 and 1996, permitted to 15,000 ft.
Its 2 leases have reported 28.8K barrels of oil and 102K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 30, 2026
- Permits on file
- 9,293
- Phone
- (866) 212-1212
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Chevron U. S. A. Inc.through Dec 2015 |
| Latest permit | Chevron U. S. A. Inc.Mar 22, 1996 |
- 15,000
- total depth, ft
- 2
- permits on file
- Mar 22, 1996
- last permit issued
- —
- completed
- 28.8K
- cumulative oil, bbl
- 102K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Killingsworth, C.O. O-14-8436 | Mills Ranch (Granite Wash Cons.) | Mmgl Txph, LLC | 1 | 2.56K | 14.9K | May 2010 – Jul 2026 |
| Killingsworth, C.O. O-14-4409 | Mills Ranch (Granite Wash) | Chevron U. S. A. Inc. | 1 | 26.2K | 87.4K | Jan 1993 – Jul 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jun 1993 → Dec 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 446080-99 | Recompletion | Chevron U. S. A. Inc. | Mar 20, 1996 | Mar 22, 1996 | — | 15,000 |
| 38843-99 | Drill | Chevron U. S. A. Inc. | Dec 13, 1978 | Dec 13, 1978 | Jan 24, 1979 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-4409 | — | — | — | — |
| — | — O-14-8436 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,257 | 10,539 | Perforated |
| 10,257 | 10,714 | Perforated |
| 10,612 | 10,714 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 520 | 17.5 | 625 S |
| 13.375 | 520 | — | 625 S |
| 9.625 | 5,150 | 12.25 | 2,550 S |
| 9.625 | 5,150 | — | 2,550 S |
| 5.5 | 10,898 | 8.75 | 2,800 S |
| 5.5 | 10,898 | — | 2,800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 6, 2012 | Jul 20, 1993 | — |
| 00 | Sep 7, 1993 | Jul 20, 1993 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-30608 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-30608 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48330608, documented in the API reference.