TEXAS · WELLS · WHEELER COUNTY · MAXWELL UNIT LEASE · API 42-483-30655 · DISTRICT 08

Maxwell Unit #1-23

Shut in

Wheeler County · Dyco (Granite Wash) field · Temp Abandoned  · Vertical

Maxwell Unit #1-23 (API 42-483-30655) is a well in Wheeler County operated by Mmgl Txph LLC, completed June 15, 1982 and listed as temp abandoned on the RRC schedule, shut in April 1, 2025.

The RRC has issued 2 drilling permits between 1980 and 1982, permitted to 14,873 ft.

It was permitted by Dyco Petroleum Corporation and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Its lease has reported 18.1K barrels of oil and 2.98M mcf of gas since January 1993, last reporting volume in March 2025.

Operator of record

Mmgl Txph LLC

Permitted by Dyco Petroleum Corporation; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsMmgl Txph, LLCthrough Mar 2025
Latest permitDyco Petroleum CorporationSep 16, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,873
total depth, ft
2
permits on file
Sep 16, 1982
last permit issued
Jun 15, 1982
completed
18.1K
cumulative oil, bbl
2.98M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2025

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 15, 1982
Shut in
Apr 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maxwell Unit G-14-101377Dyco (Granite Wash)Mmgl Txph, LLC118.1K2.98MJan 1993 – Mar 2025

Gas, mcf lease total

Last 12 months 0 · prior 12 1,362(-100%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samson Resources CompanyJan 1993 → Mar 1995
  2. 2Samson Hydrocarbons CompanyApr 1995 → Jul 1996
  3. 3Samson Lone Star LPAug 1996 → Jun 2007
  4. 4Samson Lone Star, LLCJul 2007 → Apr 2015
  5. 5Tecolote Energy Operating, LLCApr 2017 → Apr 2017
  6. 6Mmgl Txph, LLCSep 2024 → Mar 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
171972-99RecompletionDyco Petroleum CorporationSep 16, 1982Sep 16, 1982—14,873
54265-99DrillDyco Petroleum CorporationJul 16, 1980Jul 16, 1980Jul 24, 197914,850

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 15, 1982Maxwell Unit G-14-101377Dyco (Granite Wash)Mmgl Txph LLCTemp Abandoned · shut in Apr 1, 202514,873
Dec 12, 1979Maxwell Unit G-14-87884Buffalo Wallow (Morrow)Dyco Petroleum CorporationNot on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
14,44914,454Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.755,59114.752,400 S
2.87514,034——
714,2619.51,075 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 25, 1982—
00Jan 12, 1984Feb 8, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48330655, documented in the API reference.