WELL · 42-483-30958 · DISTRICT 10

Britt -3- #1

Y

Wheeler County · Key West (Morrow Upper) field · Producing  · Vertical

Britt -3- #1 (API 42-483-30958) is a well in Wheeler County operated by Presidio Petroleum LLC, completed March 4, 1982 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 16, 1981, permitted to 17,000 ft.

It was permitted by Hng Oil Company and has since transferred to Presidio Petroleum LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Pennsylvanian, Douglas, Tonkawa, Cottage Grove.

No lease production has been reported under this well’s leases.

Operator of record

Presidio Petroleum LLC

Permitted by HNG Oil Company; the EWA schedule now lists a different operator.

Based in
Canadian, TX
P-5 status
Active (A)
P-5 last filed
May 1, 2026
Permits on file
13
Phone
(806) 217-4483

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePresidio Petroleum LLC
Production reportsPresidio Petroleum LLCthrough Apr 2026
Latest permitHNG Oil CompanyOct 16, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,000
total depth, ft
1
permits on file
Oct 16, 1981
last permit issued
Mar 4, 1982
completed
0
cumulative oil, bbl
10.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 4, 1982
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Britt -3- G-14-100050Key West (Morrow Upper)Presidio Petroleum LLC1010.9MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 125,481 · prior 12 118,355(+6%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1993 → Sep 1999
  2. 2EOG Resources, Inc.Oct 1999 → Dec 2008
  3. 3Newfield Expl. Mid-Con. IncJan 2009 → Sep 2014
  4. 4LE Norman Operating LLCOct 2014 → Jun 2019
  5. 5Templar Operating LLCJul 2019 → Dec 2019
  6. 6Presidio Petroleum LLCJan 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
136771-99DrillHNG Oil CompanyOct 16, 1981Oct 16, 1981—17,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-100050————

Formation tops

As filed on W-2/G-1. Subsea from 2,530 ft elevation.Download CSV →

FormationMD ftSubsea
PennsylvanianPENN SHALE6,360-3,830
Douglas8,905-6,375
Tonkawa9,773-7,243
Cottage Grove10,370-7,840
Cleveland11,632-9,102
Granite Wash12,260-9,730
Morrow15,750-13,220

Perforations

Perforated and open-hole intervals.

FromToType
16,08516,090Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37560017.5750 S
9.6255,99312.253,200 S
2.87515,139——
715,7008.751,125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 10, 1987May 26, 1987—
00Jan 12, 1984Apr 26, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48330958, documented in the API reference.