WELL · 42-483-31221 · DISTRICT 10

Toler #1095

Plugged

Wheeler County · Candice (Morrow) field  · Vertical

Toler #1095 (API 42-483-31221) is a plugged well in Wheeler County, plugged May 20, 2016, last operated by Devon Energy Production CO L.P..

The RRC has issued 2 drilling permits between 1984 and 2010, permitted to 14,000 ft.

Completion filings report 5 formation tops, including Brown Dolomite, Base Heebner, Base Of Hebbner, Base Of Hebner.

Operator of record

Devon Energy Production Co L.P.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 18, 2025
Permits on file
9,266
Phone
(405) 235-3611

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDevon Energy Production Co L.P.
Production reportsDevon Energy Production Co, L.P.through Dec 2013
Latest permitDevon Energy Production Co, L.P.Feb 1, 2010
14,000
total depth, ft
2
permits on file
Feb 1, 2010
last permit issued
Apr 16, 1994
completed
0
cumulative oil, bbl
449K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 16, 1994
Shut in
—
Plugged
May 20, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Toler G-14-266580Buffalo Wallow (Granite Wash)Devon Energy Production Co, L.P.10775Sep 2010 – May 2016
Toler G-14-115580Candice (Morrow)Devon Energy Production Co, L.P.10448KJan 1993 – Mar 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marsh Operating CompanyJan 1993 → Dec 1995
  2. 2Seagull Midcon Inc.Jan 1996 → May 1998
  3. 3Seagull Energy E&P Inc.Jun 1998 → Oct 2000
  4. 4Ocean Energy, Inc.Nov 2000 → Aug 2003
  5. 5Devon Louisiana CorporationSep 2003 → Dec 2005
  6. 6Devon Energy Production Co, L.P.Jan 2006 → Dec 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
690422-99RecompletionDevon Energy Production Co, L.P.Jan 28, 2010Feb 1, 2010Apr 26, 201012,750
250622-99DrillMarsh, Tom F. Inc.Aug 20, 1984Sep 7, 1984—14,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-115580————
—— G-14-266580————

Formation tops

As filed on W-2/G-1. Subsea from 2,849 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite4,264-1,415
Brown Dolomite4,624-1,775
Brown DolomiteTOP OF BROWN DOLOMITE4,624-1,775
Base Heebner7,550-4,701
Base of Hebbner7,550-4,701
Base of Hebner7,550-4,701
Morrow12,208-9,359
MorrowTOP OF MORROW12,208-9,359

Perforations

Perforated and open-hole intervals.

FromToType
10,67010,680Perforated
12,29512,300Perforated
12,29512,346Perforated
12,32912,332Perforated
12,33712,346Perforated
12,42412,446Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,22511650 S
5.512,7307.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 2013Sep 25, 2012—
00Jun 14, 1994May 9, 1994—
00Jun 22, 1992Apr 20, 1992—
00Jun 25, 1986Apr 22, 1986—
00Jun 19, 1985Mar 18, 1985—
00Jun 5, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48331221, documented in the API reference.