WELL · 42-483-31501 · DISTRICT 10
Williams G.W. #10
Wheeler County · Panhandle Wheeler County Field field · Vertical
Williams G.W. #10 (API 42-483-31501) is a plugged well in Wheeler County, plugged December 16, 1999, last operated by Texaco E & P Inc..
The RRC has issued one drilling permit, issued June 30, 1997, permitted to 3,250 ft.
Completion filings report one formation top, including Granite Wash.
Its lease has reported 7.05K barrels of oil and 3.1K mcf of gas since January 1993, last reporting in February 2000. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 22, 2003
- Permits on file
- 3,332
- Phone
- (281) 561-3713
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texaco E & P Inc. |
| Production reports | Texaco E & P Inc.through Sep 1999 |
| Latest permit | Texaco E & P Inc.Jun 30, 1997 |
- 3,250
- total depth, ft
- 1
- permits on file
- Jun 30, 1997
- last permit issued
- Oct 11, 1997
- completed
- 7.05K
- cumulative oil, bbl
- 3.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 11, 1997
- Shut in
- —
- Plugged
- Dec 16, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams, G.W. O-14-1479 | Panhandle Wheeler County Field | Texaco E & P Inc. | 3 | 7.05K | 3.1K | Jan 1993 – Feb 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1S & J Operating Co.Jan 1993 → Aug 1993
- 2Stephens & Johnson Operating Co.Sep 1993 → Feb 1994
- 3Sheets, Jess W. Oil CompanyMar 1994 → Apr 1994
- 4Kellerville Operating, LLCMay 1994 → Aug 1994
- 5The Operating Co.Sep 1994 → Feb 1996
- 6Texaco E & P Inc.Mar 1996 → Sep 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 463231-99 | Drill | Texaco E & P Inc. | Jun 3, 1997 | Jun 30, 1997 | Aug 28, 1997 | 3,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-1479 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,559 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Granite Wash | 2,386 | 173 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,386 | 2,607 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 370 | 12.25 | 425 S |
| 7 | 2,386 | 8.75 | 110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 27, 1998 | Mar 11, 1998 | — |
| 00 | Oct 30, 1997 | Oct 13, 1997 | Yes |
| 00 | Oct 23, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-31501 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-31501 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48331501, documented in the API reference.