WELL · 42-483-31692 · DISTRICT 10
Puryear Tom #2028
Wheeler County · Britt Ranch W. (Granite Wash a ) field · Vertical
Puryear Tom #2028 (API 42-483-31692) is a plugged well in Wheeler County, plugged June 14, 2013, last operated by Qep Energy Company.
The RRC has issued one drilling permit, issued May 7, 2004, permitted to 12,400 ft.
It was permitted by Questar Expl. And Prod. CO. and has since transferred to Qep Energy Company on the wellbore schedule.
Completion filings report 6 formation tops, including Brown Dolomite, Douglas, Hogshooter, Checkerboard.
Operator of record
Permitted by Questar Expl. and Prod. Co.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 3, 2025
- Permits on file
- 745
- Phone
- (432) 221-7400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | QEP Energy Company |
| Production reports | QEP Energy Companythrough Jun 2013 |
| Latest permit | Questar Expl. and Prod. Co.May 7, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,400
- total depth, ft
- 1
- permits on file
- May 7, 2004
- last permit issued
- Aug 13, 2004
- completed
- 0
- cumulative oil, bbl
- 418K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2004 THROUGH Jun 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 13, 2004
- Shut in
- —
- Plugged
- Jun 14, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Puryear, Tom G-14-204591 | Britt Ranch W. (Granite Wash a ) | QEP Energy Company | 1 | 0 | 418K | Aug 2004 – Jun 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Questar Expl. and Prod. Co.Aug 2004 → Aug 2010
- 2QEP Energy CompanySep 2010 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 545470-99 | Drill | Questar Expl. and Prod. Co. | May 7, 2004 | May 7, 2004 | — | 12,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-204591 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,260 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 4,490 | -2,230 |
| Douglas | 8,757 | -6,497 |
| Hogshooter | 10,850 | -8,590 |
| Checkerboard | 11,176 | -8,916 |
| Cleveland | 11,474 | -9,214 |
| Granite WashGRANITE WASH A | 12,185 | -9,925 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,185 | 12,252 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 357 | 17.5 | 380 S |
| 8.625 | 2,997 | 12.25 | 500 S |
| 4.5 | 12,393 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 22, 2005 | Sep 7, 2004 | Yes |
| 00 | Dec 13, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-31692 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-31692 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48331692, documented in the API reference.