TEXAS · WELLS · WHEELER COUNTY · STILES RANCH 5 LEASE · API 42-483-31884 · DISTRICT 08
Stiles Ranch 5 #3
Wheeler County · Stiles Ranch (Granite Wash Cons) field · Vertical
Stiles Ranch 5 #3 (API 42-483-31884) is a plugged well in Wheeler County, plugged May 26, 2009, last operated by Chesapeake Operating Inc..
The RRC has issued one drilling permit, issued May 25, 2005, permitted to 16,000 ft.
Completion filings report 4 formation tops, including B. Heebner, Tonkawa, Missourian, Des Moines.
Its lease has reported 8.32K barrels of oil and 157K mcf of gas since September 2005, with no volume in the three years through April 2026.
Operator of record
- Based in
- Oklahoma City, OK
- P-5 status
- Delinquent (D)
- P-5 last filed
- Dec 10, 2024
- Permits on file
- 13,061
- Phone
- (405) 935-3100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating Inc. |
| Production reports | Chesapeake Operating, Inc.through Jun 2008 |
| Latest permit | Chesapeake Operating, Inc.May 25, 2005 |
- 16,000
- total depth, ft
- 1
- permits on file
- May 25, 2005
- last permit issued
- Feb 15, 2008
- completed
- 8.32K
- cumulative oil, bbl
- 157K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Jun 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 15, 2008
- Shut in
- —
- Plugged
- May 26, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stiles Ranch 5 G-14-213559 | Stiles Ranch (Granite Wash Cons) | Chesapeake Operating, Inc. | 1 | 8.32K | 157K | Sep 2005 – Jun 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.Sep 2005 → Jun 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 601225-99 | Drill | Chesapeake Operating, Inc. | May 25, 2005 | May 25, 2005 | Aug 10, 2005 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 15, 2008 | Stiles Ranch 5 G-14-213559 | Stiles Ranch (Granite Wash Cons) | Chesapeake Operating Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,257 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B. Heebner | 9,033 | -6,776 |
| Tonkawa | 9,912 | -7,655 |
| Missourian | 10,440 | -8,183 |
| Des Moines | 12,401 | -10,144 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,553 | 14,014 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 907 | 11 | 610 S |
| 4.5 | 14,109 | 7.875 | 630 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 7, 2008 | Feb 22, 2008 | — |
| 00 | May 4, 2006 | Jan 13, 2006 | Yes |
| 00 | Feb 1, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-31884 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-31884 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48331884, documented in the API reference.