WELL · 42-483-32007 · DISTRICT 10
Ledbetter 66 #4
Wheeler County · Stiles Ranch (Granite Wash Cons) field · Vertical
Ledbetter 66 #4 (API 42-483-32007) is a plugged well in Wheeler County, plugged October 26, 2018, last operated by 4p Energy Texas LLC.
The RRC has issued one drilling permit, issued December 27, 2005, permitted to 16,000 ft.
It was permitted by Chesapeake Operating, Inc. and has since transferred to 4p Energy Texas LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Base Heebner, Tonkawa, Missourian, Des Moines.
Operator of record
Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.
- Based in
- Denver, CO
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 14, 2020
- Permits on file
- 127
- Phone
- (303) 290-0990
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | 4P Energy Texas LLC |
| Production reports | Chesapeake Operating, Inc.through Jun 2013 |
| Latest permit | Chesapeake Operating, Inc.Dec 27, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,000
- total depth, ft
- 1
- permits on file
- Dec 27, 2005
- last permit issued
- Mar 3, 2006
- completed
- 0
- cumulative oil, bbl
- 624K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2006 THROUGH Apr 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 3, 2006
- Shut in
- —
- Plugged
- Oct 26, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ledbetter 66 G-14-216378 | Stiles Ranch (Granite Wash Cons) | 4P Energy Texas, LLC | 1 | 0 | 624K | Apr 2006 – Apr 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.Apr 2006 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 611553-99 | Drill | Chesapeake Operating, Inc. | Dec 23, 2005 | Dec 27, 2005 | Feb 3, 2006 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-216378 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,232 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Heebner | 9,079 | -6,847 |
| Tonkawa | 9,908 | -7,676 |
| Missourian | 10,436 | -8,204 |
| Des Moines | 12,371 | -10,139 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,410 | 13,848 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 965 | 11 | 610 S |
| 4.5 | 14,000 | 7.875 | 820 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 27, 2014 | Jun 17, 2013 | — |
| 00 | Oct 9, 2006 | May 11, 2006 | Yes |
| 00 | Jun 14, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-32007 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-32007 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48332007, documented in the API reference.