TEXAS · WELLS · WHEELER COUNTY · BRITT RANCH UNIT LEASE · API 42-483-32164 · DISTRICT 08

Britt Ranch Unit #6

On schedule

Wheeler County · Stiles Ranch (Granite Wash Cons) field · Producing  · Vertical

Britt Ranch Unit #6 (API 42-483-32164) is a well in Wheeler County operated by Presidio Petroleum LLC, completed November 20, 2006 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 26, 2006, permitted to 15,825 ft.

It was permitted by Newfield Expl. Mid-Con. Inc and has since transferred to Presidio Petroleum LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Marmaton, Cherokee/Red Ford, Cherokee/Red Fork, Atoka.

Its lease has reported 9.69K barrels of oil and 1.13M mcf of gas since November 2006, last reporting volume in August 2026.

Operator of record

Presidio Petroleum LLC

Permitted by Newfield Expl. Mid-Con. Inc; the EWA schedule now lists a different operator.

Based in
Canadian, TX
P-5 status
Active (A)
P-5 last filed
May 1, 2026
Permits on file
13
Phone
(806) 217-4483

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePresidio Petroleum LLC
Production reportsPresidio Petroleum LLCthrough Aug 2026
Latest permitNewfield Expl. Mid-Con. IncJul 26, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,825
total depth, ft
1
permits on file
Jul 26, 2006
last permit issued
Nov 20, 2006
completed
9.69K
cumulative oil, bbl
1.13M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · NOV 2006 THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 20, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Britt Ranch Unit G-14-225462Stiles Ranch (Granite Wash Cons)Presidio Petroleum LLC19.69K1.13MNov 2006 – Aug 2026

Gas, mcf lease total

Last 12 months 16,560 · prior 12 18,132(-9%)

01K2K3K202420252026

Wells named Britt Ranch Unit

Presidio Petroleum LLC's other wells filed under this lease name in Wheeler County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Newfield Expl. Mid-Con. IncNov 2006 → Sep 2014
  2. 2Le Norman Operating LLCOct 2014 → Jun 2019
  3. 3Templar Operating LLCJul 2019 → Dec 2019
  4. 4Presidio Petroleum LLCJan 2020 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
622807-99DrillNewfield Expl. Mid-Con. IncJul 18, 2006Jul 26, 2006Aug 12, 200615,850

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 20, 2006Britt Ranch Unit G-14-225462Stiles Ranch (Granite Wash Cons)Presidio Petroleum LLCProducing15,825

Formation tops

As filed on W-2/G-1. Subsea from 2,422 ft elevation.Download CSV →

FormationMD ftSubsea
Marmaton12,335-9,913
Cherokee/Red Ford13,706-11,284
Cherokee/Red Fork13,706-11,284
Atoka14,429-12,007

Perforations

Perforated and open-hole intervals.

FromToType
13,21313,640Perforated
13,85314,362Perforated
14,47615,030Perforated
15,09215,650Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.62546717.5450 S
9.6253,30712.25370 S
5.515,8007.8751,255 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 14, 2014Jan 8, 2014—
00Apr 14, 2007Feb 26, 2007Yes
00Mar 22, 2007——

Well logs

3 logs loaded from the RRC's log index, the latest received Nov 30, 2009. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
RESISTIVITYSpans Marmaton, Cherokee/Red Fork, Cherokee/Red Ford, AtokaTIFF3,308 to 15,460Nov 30, 2009run Nov 22, 20069.99
NEUTRON/DENSITY POROSITYSpans Marmaton, Cherokee/Red Ford, Cherokee/Red Fork, AtokaTIFF10,000 to 15,820Oct 19, 2009run Oct 15, 20067.65
RESISTIVITYSpans Marmaton, Cherokee/Red Fork, Cherokee/Red Ford, AtokaTIFF10,000 to 15,820Oct 19, 2009run Oct 15, 200610.1

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48332164, documented in the API reference.