TEXAS · WELLS · WHEELER COUNTY · DONELSON 15 LEASE · API 42-483-32588 · DISTRICT 08

Donelson 15 #2

Plugged

Wheeler County · Buffalo Wallow (Granite Wash) field  · Vertical

Donelson 15 #2 (API 42-483-32588) is a plugged well in Wheeler County, plugged October 10, 2018, last operated by Unbridled Resources LLC.

The RRC has issued 2 drilling permits between 2008 and 2011, permitted to 15,090 ft.

It was permitted by Linn Operating, Inc. and has since transferred to Unbridled Resources LLC on the wellbore schedule.

Completion filings report 8 formation tops, including T/Brown Dolomite, B/Heebner-T/Douglas, T/Tonkawa, T/Carr Gw.

Operator of record

Unbridled Resources LLC

Permitted by Linn Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 17, 2025
Permits on file
6
Phone
(318) 751-3917

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnbridled Resources LLC
Production reportsLinn Operating, Inc.through Nov 2013
Latest permitLinn Operating, Inc.Apr 14, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,090
total depth, ft
2
permits on file
Apr 14, 2011
last permit issued
Jun 3, 2008
completed
0
cumulative oil, bbl
243K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2008 THROUGH May 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 3, 2008
Shut in
—
Plugged
Oct 10, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Donelson 15 G-14-239571West Park (Granite Wash)Unbridled Resources, LLC10243KJun 2008 – May 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Linn Operating, Inc.Jun 2008 → Nov 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
713440-99Field transferLinn Operating, Inc.Apr 4, 2011Apr 14, 2011Apr 18, 200815,090
656787-99DrillLinn Operating, Inc.Mar 6, 2008Mar 14, 2008Apr 17, 200815,090

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 3, 2008Donelson 15 G-14-239571Buffalo Wallow (Granite Wash)Unbridled Resources LLCPlugged—
Jun 3, 2008Donelson 15 G-14-239571Buffalo Wallow (Granite Wash)Unbridled Resources LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,622 ft elevation.Download CSV →

FormationMD ftSubsea
T/Brown Dolomite4,696-2,074
B/Heebner-T/Douglas8,431-5,809
T/Tonkawa9,294-6,672
T/Carr GW11,698-9,076
T/Britt Granite Wash11,808-9,186
Granite WashGRANITE WASH A11,850-9,228
Granite WashGRANITE WASH A, B & C11,950-9,328
Granite WashGRANITE WASH B12,130-9,508
Granite WashGRANITE WASH C12,309-9,687
T/Granite Wash "D" Shale12,647-10,025
T/Granite Wash D Shale12,647-10,025

Perforations

Perforated and open-hole intervals.

FromToType
11,83214,080Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,35712.251,875 S
5.514,1757.875460 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 29, 2012Apr 20, 2011—
00Oct 11, 2008Aug 18, 2008Yes
00Oct 4, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48332588, documented in the API reference.