TEXAS · WELLS · WHEELER COUNTY · API 42-483-32617 · DISTRICT 08

Quillian #205

Shut in

Wheeler County · Mills Ranch (Granite Wash Cons.) field · Shut In  · Vertical

Quillian #205 (API 42-483-32617) is a well in Wheeler County operated by Sanguine Gas Exploration LLC, completed October 1, 2009 and listed as shut in on the RRC schedule, shut in September 1, 2015.

The RRC has issued one drilling permit (amended twice), issued April 3, 2008, permitted to 11,550 ft.

Completion filings report 4 formation tops, including Douglas, Virgil, Cottage Grove, Marmaton.

Its 2 leases have reported 55.2K barrels of oil and 169K mcf of gas since October 2009, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Sanguine Gas Exploration LLC

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Oct 21, 2025
Permits on file
204
Phone
(918) 494-6070

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSanguine Gas Exploration LLC
Production reportsSanguine Gas Exploration, LLCthrough May 2015
Latest permitSanguine Gas Exploration, LLCApr 3, 2008
11,550
total depth, ft
3
permits on file
Apr 3, 2008
last permit issued
Oct 1, 2009
completed
55.2K
cumulative oil, bbl
169K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 1, 2009
Shut in
Sep 1, 2015
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Quillian O-14-8119Mills Ranch (Granite Wash Cons.)Sanguine Gas Exploration, LLC132.8K130KMar 2010 – Jul 2026
Quillian O-14-8050Mills Ranch (Granite Wash, K.C.)Sanguine Gas Exploration, LLC122.4K39.3KOct 2009 – Jun 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sanguine Gas Exploration, LLCOct 2009 → May 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
657873-97DrillSanguine Gas Exploration, LLCJul 23, 2009Apr 3, 2008Sep 10, 200912,000
657873-98DrillSanguine Gas Exploration, LLCMay 21, 2009Apr 3, 2008Sep 10, 200912,000
657873-99DrillSanguine Gas Exploration, LLCMar 20, 2008Apr 3, 2008Sep 10, 200917,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 1, 2009Quillian O-14-8119Mills Ranch (Granite Wash Cons.)Sanguine Gas Exploration LLCShut In · shut in Sep 1, 201511,550
Oct 1, 2009Quillian O-14-8050Mills Ranch (Granite Wash K.C.)Sanguine Gas Exploration LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,233 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas8,865-6,632
Virgil9,079-6,846
Cottage Grove10,234-8,001
Marmaton10,920-8,687

Perforations

Perforated and open-hole intervals.

FromToType
10,31010,352Perforated
11,01011,160Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62592012.25660 S
5.511,5508.75800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 23, 2010Oct 29, 2009Yes
00Feb 11, 2010Oct 29, 2009Yes
00Dec 17, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48332617, documented in the API reference.