WELL · 42-483-32660 · DISTRICT 10
Neeley #505
Wheeler County · Mills Ranch (Granite Wash K.C.) field · Vertical
Neeley #505 (API 42-483-32660) is a well in Wheeler County operated by Sanguine Gas Exploration LLC, completed August 12, 2008.
The RRC has issued one drilling permit, issued July 8, 2008, permitted to 10,500 ft.
Completion filings report 2 formation tops, including Douglas, Cottage Grove.
Its 2 leases have reported 483K barrels of oil and 2.4M mcf of gas since December 2007, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Tulsa, OK
- P-5 status
- Active (A)
- P-5 last filed
- Oct 21, 2025
- Permits on file
- 204
- Phone
- (918) 494-6070
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sanguine Gas Exploration LLC |
| Production reports | Sanguine Gas Exploration, LLCthrough Apr 2026 |
| Latest permit | Sanguine Gas Exploration, LLCJul 8, 2008 |
- 10,500
- total depth, ft
- 1
- permits on file
- Jul 8, 2008
- last permit issued
- Aug 12, 2008
- completed
- 483K
- cumulative oil, bbl
- 2.4M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 12, 2008
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Neeley O-14-8111 | Mills Ranch (Granite Wash Cons.) | Sanguine Gas Exploration, LLC | 5 | 341K | 2.02M | Mar 2010 – Jul 2026 |
| Neeley O-14-7827 | Mills Ranch (Granite Wash, K.C.) | Sanguine Gas Exploration, LLC | 3 | 142K | 376K | Dec 2007 – Jun 2010 |
Gas, mcf lease total
Last 12 months 58,219 · prior 12 66,926(-13%)
Oil, barrels lease total
Last 12 months 3,063 · prior 12 4,323(-29%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sanguine Gas Exploration, LLCDec 2007 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 662373-99 | Drill | Sanguine Gas Exploration, LLC | May 19, 2008 | Jul 8, 2008 | Jul 13, 2008 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-7827 | — | — | — | — |
| — | — O-14-8111 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,226 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Douglas | 8,742 | -6,516 |
| Cottage Grove | 10,081 | -7,855 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,186 | 10,220 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 920 | 12.25 | 1,155 S |
| 5.5 | 10,400 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 23, 2010 | Sep 9, 2008 | Yes |
| 00 | Dec 2, 2008 | Sep 9, 2008 | Yes |
| 00 | Nov 6, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-32660 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-32660 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48332660, documented in the API reference.