WELL · 42-483-33187 · DISTRICT 10

Donelson 15 #4H

Y

Wheeler County · Buffalo Wallow (Granite Wash) field · Producing  · Horizontal

Donelson 15 #4H (API 42-483-33187) is a horizontal well in Wheeler County operated by Unbridled Resources LLC, completed March 2, 2022 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 4, 2011, permitted to 12,392 ft.

It was permitted by Linn Operating, Inc. and has since transferred to Unbridled Resources LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Brown Dolomite, Pennsylvanian, T/Douglas, Tonkawa.

No lease production has been reported under this well’s leases.

Operator of record

Unbridled Resources LLC

Permitted by Linn Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 17, 2025
Permits on file
6
Phone
(318) 751-3917

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnbridled Resources LLC
Production reportsUnbridled Resources, LLCthrough Apr 2026
Latest permitLinn Operating, Inc.Mar 4, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,392
total depth, ft
2
permits on file
Mar 4, 2011
last permit issued
Mar 2, 2022
completed
0
cumulative oil, bbl
2.47M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 2, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Donelson 15 G-14-265000Buffalo Wallow (Granite Wash)Unbridled Resources, LLC102.47MOct 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 96,793 · prior 12 82,111(+18%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Linn Operating, Inc.Nov 2011 → Dec 2014
  2. 2Enervest Operating, L.L.C.Jan 2015 → Mar 2018
  3. 34P Energy Texas, LLCApr 2018 → Oct 2020
  4. 4Unbridled Resources, LLCNov 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
710890-98DrillLinn Operating, Inc.Apr 4, 2011Mar 4, 2011Aug 19, 201112,392
710890-99DrillLinn Operating, Inc.Feb 24, 2011Mar 4, 2011Aug 19, 201112,392

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-265000————

Formation tops

As filed on W-2/G-1. Subsea from 2,616 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite4,590-1,974
PennsylvanianPENN SHALE6,516-3,900
T/Douglas8,465-5,849
Tonkawa9,322-6,706
Avant LS10,042-7,426
Kansas CityKANSAS CITY A10,361-7,745
Cleveland10,771-8,155
Marmaton11,011-8,395
Oswego11,189-8,573
Cherokee Marker11,509-8,893

Perforations

Perforated and open-hole intervals.

FromToType
12,21916,082Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37570817.51,170 S
9.6256,99012.25885 S
5.516,2148.751,240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 19, 2022Mar 9, 2022—
00Oct 19, 2012Feb 15, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48333187, documented in the API reference.