TEXAS · WELLS · WHEELER COUNTY · STILES 16 LEASE · API 42-483-33633 · DISTRICT 08

Stiles 16 #1516H

Y

Wheeler County · Mills Ranch (Granite Wash Cons.) field · Producing  · Horizontal

Stiles 16 #1516H (API 42-483-33633) is a horizontal well in Wheeler County operated by Formentera Operations LLC, completed July 19, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued January 14, 2013, permitted to 10,558 ft.

It was permitted by Apache Corporation and has since transferred to Formentera Operations LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Douglas, Tonkawa, Cottage Grove, Cottage Grove C.

Its lease has reported 186K barrels of oil and 1.35M mcf of gas since July 2013, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Formentera Operations LLC

Permitted by Apache Corporation; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 11, 2026
Permits on file
90
Phone
(512) 514-5779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFormentera Operations LLC
Production reportsFormentera Operations LLCthrough Apr 2026
Latest permitApache CorporationJan 14, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,558
total depth, ft
3
permits on file
Jan 14, 2013
last permit issued
Jul 19, 2013
completed
186K
cumulative oil, bbl
1.35M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 19, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stiles 16 O-14-8944Mills Ranch (Granite Wash Cons.)Formentera Operations LLC2186K1.35MJul 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 58,591 · prior 12 63,259(-7%)

05K10K202420252026

Oil, barrels lease total

Last 12 months 1,883 · prior 12 2,299(-18%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Apache CorporationJul 2013 → Dec 2014
  2. 2Tapstone Energy, LLCJan 2015 → May 2021
  3. 3Formentera Operations LLCJun 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
754290-97DrillApache CorporationMar 7, 2013Jan 14, 2013Feb 18, 201311,000
754290-98DrillApache CorporationFeb 18, 2013Jan 14, 2013Feb 18, 201311,000
754290-99DrillApache CorporationJan 8, 2013Jan 14, 2013Feb 18, 201311,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 19, 2013Stiles 16 O-14-8944Mills Ranch (Granite Wash Cons.)Formentera Operations LLCProducing10,558

Formation tops

As filed on W-2/G-1. Subsea from 2,282 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas9,065-6,783
Tonkawa9,956-7,674
Cottage Grove10,429-8,147
Cottage Grove C10,553-8,271

Perforations

Perforated and open-hole intervals.

FromToType
10,90014,872Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37536817.5605 S
9.6256,63312.251,300 S
5.514,9118.75990 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 13, 2014Aug 14, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48333633, documented in the API reference.