TEXAS · WELLS · WICHITA COUNTY · KMA WATERFLOOD-SOUTHWEST UNIT LEASE · API 42-485-01118 · DISTRICT 7C

Kma Waterflood-Southwest Unit #2

Y

Wichita County · K-M-A field · Producing  · Vertical

Kma Waterflood-Southwest Unit #2 (API 42-485-01118) is a well in Wichita County operated by Stephens & Johnson Operating CO., completed May 4, 1990 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1982 and 1983, permitted to 4,390 ft.

It was permitted by Petro-Lewis Corporation and has since transferred to Stephens & Johnson Operating CO. on the wellbore schedule.

Its lease has reported 5.27M barrels of oil and 19 mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 160 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Permitted by Petro-Lewis Corporation; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitPetro-Lewis CorporationOct 17, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,390
total depth, ft
2
permits on file
Oct 17, 1983
last permit issued
May 4, 1990
completed
5.27M
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 4, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 160 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kma Waterflood-Southwest Unit O-13-10267K-M-AStephens & Johnson Operating Co.1605.27M19Jan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 113,507 · prior 12 119,611(-5%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1S & J Operating Co.Jan 1993 → Aug 1993
  2. 2Stephens & Johnson Operating Co.Sep 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
217483-99OtherPetro-Lewis CorporationOct 12, 1983Oct 17, 1983—4,390
157503-99OtherPetro-Lewis CorporationApr 20, 1982Apr 20, 1982—4,390

Completions

CompletedLeaseFieldOperatorStatusDepth
May 4, 1990Kma Waterflood-Southwest Unit O-13-10267K-M-AStephens & Johnson Operating Co.Producing4,390
Sep 26, 1983Ferguson O-13-6259K-M-AStephens & Johnson Operating Co.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
3,8483,867Perforated
3,8603,874Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7512213.7575 S
2.3753,834——
5.54,3907.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 14, 1990May 15, 1990—
00Aug 3, 1990——
00Jan 12, 1984Oct 21, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48501118, documented in the API reference.