TEXAS · WELLS · WICHITA COUNTY · API 42-485-14438 · DISTRICT 7C

Kma Waterflood-Southwest Unit #374

Plugged

Wichita County · K-M-A field  · Vertical

Kma Waterflood-Southwest Unit #374 (API 42-485-14438) is a plugged well in Wichita County, plugged September 25, 2017, last operated by Stephens & Johnson Operating CO..

The RRC has issued one drilling permit, issued August 28, 2007, permitted to 4,363 ft.

Its 2 leases have reported 5.28M barrels of oil and 38 mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 163 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitStephens & Johnson Operating Co.Aug 28, 2007
4,363
total depth, ft
1
permits on file
Aug 28, 2007
last permit issued
Mar 11, 1976
completed
5.28M
cumulative oil, bbl
38
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 11, 1976
Shut in
—
Plugged
Sep 25, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 163 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kma Waterflood-Southwest Unit O-13-10267K-M-AStephens & Johnson Operating Co.1605.27M19Jan 1993 – Apr 2026
Griffin, N. C. O-13-17431K-M-A (Ellenburger)Stephens & Johnson Operating Co.33.93K19Jan 1993 – Aug 1994

Oil, barrels lease total

Last 12 months 113,507 · prior 12 119,611(-5%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1S & J Operating Co.Jan 1993 → Aug 1993
  2. 2Stephens & Johnson Operating Co.Sep 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
643128-99RecompletionStephens & Johnson Operating Co.Jul 24, 2007Aug 28, 2007Jan 8, 20074,363

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 11, 1976Griffin N. C. O-13-17431K-M-A (Ellenburger)Stephens & Johnson Operating Co.Plugged—
Mar 11, 1976Kma Waterflood-Southwest Unit O-13-10267K-M-AStephens & Johnson Operating Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,8683,886Perforated
—4,363Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251011150 S
5.54,3167.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 13, 2007Apr 13, 2007Yes
00Nov 8, 2007——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
295K
bbl, all reported
Apr 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000097056H-1 InjectionPlugged Oct 5, 20171,0001,9003,868–3,886

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48514438, documented in the API reference.