TEXAS · WELLS · WICHITA COUNTY · NANCE LEASE · API 42-485-34786 · DISTRICT 7C

Nance #175

Shut in

Wichita County · Wichita County Regular field · Shut In  · Vertical

Nance #175 (API 42-485-34786) is a well in Wichita County operated by Olenox Corp., completed August 16, 1994 and listed as shut in on the RRC schedule, shut in March 1, 2012.

The RRC has issued one drilling permit, issued March 22, 1978, permitted to 1,271 ft.

It was permitted by Johnson, F. T., JR. and has since transferred to Olenox Corp. on the wellbore schedule.

Its lease has reported 78.1K barrels of oil and 21 mcf of gas since January 1993, last reporting volume in July 2025. The lease carries 71 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Olenox Corp.

Permitted by Johnson, F. T., Jr.; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 20, 2026
Phone
(832) 487-7766

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOlenox Corp.
Production reportsOlenox Corp.through Jul 2025
Latest permitJohnson, F. T., Jr.Mar 22, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,271
total depth, ft
1
permits on file
Mar 22, 1978
last permit issued
Aug 16, 1994
completed
78.1K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2025

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 16, 1994
Shut in
Mar 1, 2012
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 71 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nance O-13-5569Wichita County RegularOlenox Corp.7178.1K21Jan 1993 – Jul 2025

Oil, barrels lease total

Last 12 months 21 · prior 12 91(-77%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Johnson & Ernst Operating Co.Jan 1993 → Mar 2018
  2. 2Slant Operating, LLCApr 2018 → Apr 2022
  3. 3Burk Royalty Co., Ltd.May 2022 → Jun 2023
  4. 4Sherman Oil Company LLCAug 2023 → Nov 2023
  5. 5L7 Energy LLCDec 2023 → Apr 2025
  6. 6Olenox Corp.May 2025 → Jul 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
20575-99DrillJohnson, F. T., Jr.Mar 22, 1978Mar 22, 1978—1,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 16, 1994Nance O-13-5569Wichita County RegularOlenox Corp.Shut In · shut in Mar 1, 20121,271

Perforations

Perforated and open-hole intervals.

FromToType
1,2301,240Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
7648.7520 S
4.51,2636.2550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 20, 1994Aug 18, 1994—
00Jan 12, 1984May 15, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
14.4K
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079951H-1 InjectionActive2506001,230–1,240

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48534786, documented in the API reference.