TEXAS · WELLS · WICHITA COUNTY · SCHULZ, A. J. LEASE · API 42-485-35061 · DISTRICT 7C

Schulz A. J. #56

Plugged

Wichita County · Wichita County Regular field  · Vertical

Schulz A. J. #56 (API 42-485-35061) is a plugged well in Wichita County, plugged December 5, 2018, last operated by Waggoner Operating L.L.C..

The RRC has issued one drilling permit, issued September 8, 1978, permitted to 1,750 ft.

It was permitted by Burns, P. C. and has since transferred to Waggoner Operating L.L.C. on the wellbore schedule.

Its lease has reported 136K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The lease carries 27 wells, so these are lease totals, not this well alone.

Operator of record

Waggoner Operating L.L.C.

Permitted by Burns, P. C.; the EWA schedule now lists a different operator.

Based in
Vernon, TX
P-5 status
Active (A)
P-5 last filed
Mar 31, 2026
Permits on file
80
Phone
(940) 552-2521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaggoner Operating L.L.C.
Production reportsDara Operating Company, LLCthrough Apr 2026
Latest permitBurns, P. C.Sep 8, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,750
total depth, ft
1
permits on file
Sep 8, 1978
last permit issued
Dec 19, 1978
completed
136K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 19, 1978
Shut in
—
Plugged
Dec 5, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 27 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schulz, A. J. O-13-5222Wichita County RegularWaggoner Operating, L.L.C.27136K22Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 62 · prior 12 23(+170%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Primrose Operating CompanyJan 1993 → Sep 1996
  2. 2Witt OperatingOct 1996 → May 1998
  3. 3McDay Energy Corp.Jun 1998 → Jul 2008
  4. 4WG Operating, Inc.Aug 2008 → May 2012
  5. 5Halcon Operating Co., Inc.Jun 2012 → Oct 2013
  6. 6Layline Energy I LLCNov 2013 → Dec 2019
  7. 7Vinland Texas Services LLCJan 2020 → Feb 2024
  8. 8Dara Operating Company, LLCMar 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
32225-99DrillBurns, P. C.Sep 8, 1978Sep 8, 1978—1,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 19, 1978Schulz A. J. O-13-5222Wichita County RegularWaggoner Operating L.L.C.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
1,6551,665Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6254612.2550 S
2.3751,610——
4.51,7256.75305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 1, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
35.2K
bbl, all reported
May 2019
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000050147H-1 InjectionPlugged Dec 17, 2018759001,650–1,657

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120182019

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48535061, documented in the API reference.