TEXAS · WELLS · WICHITA COUNTY · WAGGONER, T. J. & J. L. -C- LEASE · API 42-485-35464 · DISTRICT 7C

Waggoner T. J. & J. L. -C- #1

Shut in

Wichita County · Wichita County Regular field · Shut In  · Vertical

Waggoner T. J. & J. L. -C- #1 (API 42-485-35464) is a well in Wichita County operated by Rocky Point Oil Inc., completed May 24, 1979 and listed as shut in on the RRC schedule, shut in September 1, 1999.

The RRC has issued one drilling permit, issued April 12, 1979, permitted to 1,975 ft.

It was permitted by Shillelagh Corporation and has since transferred to Rocky Point Oil Inc. on the wellbore schedule.

Its lease has reported 11.6K barrels of oil and 81 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 12 wells, so these are lease totals, not this well alone.

Operator of record

Rocky Point Oil Inc.

Permitted by Shillelagh Corporation; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 18, 2026
Permits on file
34
Phone
(940) 767-7447

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRocky Point Oil Inc.
Production reportsRocky Point Oil, Inc.through Dec 2003
Latest permitShillelagh CorporationApr 12, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,975
total depth, ft
1
permits on file
Apr 12, 1979
last permit issued
May 24, 1979
completed
11.6K
cumulative oil, bbl
81
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2003

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 24, 1979
Shut in
Sep 1, 1999
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waggoner, T. J. & J. L. -C- O-13-19355Wichita County RegularRocky Point Oil, Inc.1211.6K81Jan 1993 – Dec 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sauder Management CompanyJan 1993 → Oct 1996
  2. 2Quatro Oil and Gas, Inc.Nov 1996 → Apr 1999
  3. 3Rocky Point Oil, Inc.May 1999 → May 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
46238-99DrillShillelagh CorporationApr 12, 1979Apr 12, 1979Apr 16, 19792,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 24, 1979Waggoner T. J. & J. L. -C- O-13-19355Wichita County RegularRocky Point Oil Inc.Shut In · shut in Sep 1, 19991,975

Perforations

Perforated and open-hole intervals.

FromToType
1,3971,402Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6256012.7550 S
21,393——
4.51,8107.875145 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 4, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48535464, documented in the API reference.