WELL · 42-485-37540 · DISTRICT 9

Ancell -J- #2

Y

Wichita County · Ancell (Kma Lime 4000) field · Producing  · Vertical

Ancell -J- #2 (API 42-485-37540) is a well in Wichita County operated by Quatro Oil And Gas Inc., completed December 23, 2002 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 24, 1981, permitted to 4,500 ft.

It was permitted by Ellis, Ken Oil CO. and has since transferred to Quatro Oil And Gas Inc. on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 41.3K barrels of oil and 1.25K mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Quatro Oil and Gas Inc.

Permitted by Ellis, Ken Oil Co.; the EWA schedule now lists a different operator.

Based in
Joshua, TX
P-5 status
Active (A)
P-5 last filed
Nov 12, 2025
Permits on file
136
Phone
(940) 767-4443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleQuatro Oil and Gas Inc.
Production reportsQuatro Oil and Gas, Inc.through Apr 2026
Latest permitEllis, Ken Oil Co.Jun 24, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
Jun 24, 1981
last permit issued
Dec 23, 2002
completed
41.3K
cumulative oil, bbl
1.25K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 23, 2002
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ancell -J- O-13-20495Ancell (Kma Lime 4000)Quatro Oil and Gas, Inc.641.3K1.25KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,009 · prior 12 1,547(-35%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1A-E Operating CommitteeJan 1993 → Dec 1996
  2. 2Lackey, William H. Oil and GasJan 1997 → Jul 2006
  3. 3Quatro Oil and Gas, Inc.Aug 2006 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
122259-99DrillEllis, Ken Oil Co.Jun 24, 1981Jun 24, 1981Jun 1, 19814,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 23, 2002Ancell -J- O-13-20495Ancell (Kma Lime 4000)Quatro Oil and Gas Inc.Producing4,500

Formation tops

As filed on W-2/G-1. Subsea from 1,091 ft elevation.Download CSV →

FormationMD ftSubsea
Gunsight2,030-939

Perforations

Perforated and open-hole intervals.

FromToType
1,9862,173Perforated
2,0202,030Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6256310.7560 S
8.6256312.2560 S
4.51,9867.875650 S
4.54,5007.875650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 13, 2003Jan 3, 2003—
00Jan 11, 1985Dec 20, 1984—
00Jan 5, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
216K
bbl, all reported
Mar 2002
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000054953W-14 DisposalCanceled Jan 8, 2003354251,986–2,173

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 1,300(-100%)

05001K1.5K20012002

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48537540, documented in the API reference.