WELL · 42-485-37943 · DISTRICT 9
Munger #1
Wichita County · K-M-A (Ellenburger) field · Injection · Vertical
Munger #1 (API 42-485-37943) is a well in Wichita County operated by R2q Operating LLC, completed August 21, 2019 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued November 10, 1981, permitted to 4,400 ft.
It was permitted by Finnell Oil CO. and has since transferred to R2q Operating LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Gunsight, Gunsite Lime, KMA, Ellenburger.
Its lease has reported 43.4K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 91.2K barrels injected in the 12 months reported through April 2025.
Operator of record
Permitted by Finnell Oil Co.; the EWA schedule now lists a different operator.
- Based in
- Iowa Park, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Sep 12, 2025
- Permits on file
- 38
- Phone
- (940) 228-1500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | R2Q Operating LLC |
| Production reports | R2Q Operating LLCthrough Feb 2026 |
| Latest permit | Finnell Oil Co.Nov 10, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,400
- total depth, ft
- 1
- permits on file
- Nov 10, 1981
- last permit issued
- Aug 21, 2019
- completed
- 43.4K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 21, 2019
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Munger O-13-21709 | K-M-A (Ellenburger) | R2Q Operating LLC | 3 | 43.4K | 21 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,274 · prior 12 2,727(-53%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Finnell Oil Co.Jan 1993 → Oct 1996
- 2Finnell Oil Services, Inc.Nov 1996 → May 2013
- 3Extex Operating CompanyAug 2013 → Aug 2015
- 4Txon Partners, LLCSep 2015 → Jun 2017
- 5White Knight Production LLCJul 2017 → May 2021
- 6R2Q Operating LLCJun 2021 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 142958-99 | Drill | Finnell Oil Co. | Nov 10, 1981 | Nov 10, 1981 | — | 4,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-21709 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,013 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| GunsightGUNSIGHT LIME | 1,771 | -758 |
| Gunsite Lime | 1,771 | -758 |
| KMA | 3,645 | -2,632 |
| Ellenburger | 4,230 | -3,217 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,650 | 3,658 | Perforated |
| 3,696 | 3,708 | Perforated |
| 3,891 | 3,900 | Perforated |
| 4,297 | 4,313 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 100 | 12.25 | 100 S |
| 2.375 | 4,285 | — | — |
| 4.5 | 4,400 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 4, 2019 | Sep 16, 2019 | — |
| 00 | Feb 11, 2015 | Jan 30, 2015 | — |
| 00 | Jan 12, 1984 | Dec 28, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-37943 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-37943 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 91.2K
- bbl, last 12 reported months
- 459K
- bbl, all reported
- Apr 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000118807 | H-1 Injection | Active | 1,000 | 1,825 | 3,650–3,900 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 91,234 · prior 12 107,318(-15%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48537943, documented in the API reference.