TEXAS · WELLS · WICHITA COUNTY · JAMES ESTATE LEASE · API 42-485-38771 · DISTRICT 7C

James Estate #1

Y

Wichita County · K-M-A field · Producing  · Vertical

James Estate #1 (API 42-485-38771) is a well in Wichita County operated by Mountain Creek Oil Company Inc., completed January 31, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 14, 1983, permitted to 4,600 ft.

It was permitted by Swanson, Tom and has since transferred to Mountain Creek Oil Company Inc. on the wellbore schedule.

Completion filings report one formation top, including KMA.

Its lease has reported 31.6K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Mountain Creek Oil Company Inc.

Permitted by Swanson, Tom; the EWA schedule now lists a different operator.

Based in
Saint JO, TX
P-5 status
Active (A)
P-5 last filed
Sep 17, 2025
Permits on file
68
Phone
(940) 366-2370

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMountain Creek Oil Company Inc.
Production reportsMountain Creek Oil Company, Inc.through Apr 2026
Latest permitSwanson, TomMar 14, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
1
permits on file
Mar 14, 1983
last permit issued
Jan 31, 1984
completed
31.6K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 31, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
James Estate O-13-24041K-M-AMountain Creek Oil Company, Inc.331.6K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 765 · prior 12 765(+0%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Swanson, TomJan 1993 → Sep 2004
  2. 2Swanson TS Est & BG Swanson PartOct 2004 → Apr 2006
  3. 3Swanson, Betty G.May 2006 → Mar 2016
  4. 4Swanson Operating, Inc.Apr 2016 → Jul 2016
  5. 5Geurin Oil & GasAug 2016 → Jul 2022
  6. 6Mountain Creek Oil Company, Inc.Mar 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
188592-99DrillSwanson, TomFeb 24, 1984Mar 14, 1983Jan 17, 19855,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 31, 1984James Estate O-13-24041K-M-AMountain Creek Oil Company Inc.Producing4,600

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
KMA4,025

Perforations

Perforated and open-hole intervals.

FromToType
4,0254,045Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6259012.2580 S
4.54,5947.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 21, 1984Feb 23, 1984—
00Mar 10, 1984Feb 23, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48538771, documented in the API reference.