TEXAS · WELLS · WICHITA COUNTY · MUNGER -A- SHALLOW LEASE · API 42-485-41658 · DISTRICT 7C

Munger -a- Shallow #51L

Plugged

Wichita County · Wichita County Regular field  · Vertical

Munger -A- Shallow #51L (API 42-485-41658) is a plugged well in Wichita County, plugged January 8, 2014, last operated by R2q Operating LLC.

The RRC has issued one drilling permit, issued February 26, 1988, permitted to 1,990 ft.

It was permitted by Landrum West, Inc. and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Cisco.

Its lease has reported 24K barrels of oil and 24 mcf of gas since January 1993, last reporting volume in February 2026. The lease carries 21 wells, so these are lease totals, not this well alone.

Operator of record

R2Q Operating LLC

Permitted by Landrum West, Inc.; the EWA schedule now lists a different operator.

Based in
Iowa Park, TX
P-5 status
Active – Extension (X)
P-5 last filed
Sep 12, 2025
Permits on file
38
Phone
(940) 228-1500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsR2Q Operating LLCthrough Feb 2026
Latest permitLandrum West, Inc.Feb 26, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,990
total depth, ft
1
permits on file
Feb 26, 1988
last permit issued
Apr 27, 1988
completed
24K
cumulative oil, bbl
24
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 27, 1988
Shut in
—
Plugged
Jan 8, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 21 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Munger -a- Shallow O-13-5427Wichita County RegularR2Q Operating LLC2124K24Jan 1993 – Feb 2026

Oil, barrels lease total

Last 12 months 282 · prior 12 422(-33%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Landrum West, Inc.Jan 1993 → Dec 1994
  2. 2Jojon Petroleum CompanyJan 1995 → Jun 1997
  3. 3Aztel Operating Inc.Jul 1997 → Oct 2003
  4. 4Extex Operating CompanyNov 2003 → Aug 2015
  5. 5Txon Partners, LLCSep 2015 → May 2017
  6. 6R2Q Operating LLCMar 2024 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
343125-99DrillLandrum West, Inc.Feb 24, 1988Feb 26, 1988—1,990

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 27, 1988Munger -a- Shallow O-13-5427Wichita County RegularR2Q Operating LLCPlugged—

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
CiscoCISCO OIL SAND1,051

Perforations

Perforated and open-hole intervals.

FromToType
1,0511,057Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,1006.75150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 27, 1988May 11, 1988Yes
00May 25, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48541658, documented in the API reference.