TEXAS · WELLS · WICHITA COUNTY · ALLEN, RED RIVER LEASE · API 42-485-43002 · DISTRICT 7C

Allen Red River #104

Plugged

Wichita County · Wichita County (Special) field  · Vertical

Allen Red River #104 (API 42-485-43002) is a plugged well in Wichita County, plugged January 15, 2021, last operated by Waggoner Operating L.L.C..

The RRC has issued one drilling permit, issued October 14, 1994, permitted to 2,500 ft.

It was permitted by Coda Energy, Inc. and has since transferred to Waggoner Operating L.L.C. on the wellbore schedule.

Completion filings report 2 formation tops, including Megargel Limestone, Thomas Sand.

Its lease has reported 427K barrels of oil and 309K mcf of gas since the record begins in January 1993, last reporting volume in April 2026. The lease carries 59 wells, so these are lease totals, not this well alone.

Operator of record

Waggoner Operating L.L.C.

Permitted by Coda Energy, Inc.; the EWA schedule now lists a different operator.

Based in
Vernon, TX
P-5 status
Active (A)
P-5 last filed
Mar 31, 2026
Permits on file
82
Phone
(940) 552-2521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaggoner Operating L.L.C.
Production reportsWaggoner Operating, L.L.C.through Apr 2026
Latest permitCoda Energy, Inc.Oct 14, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,500
total depth, ft
1
permits on file
Oct 14, 1994
last permit issued
Nov 30, 1994
completed
427K
cumulative oil, bbl
309K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH APR 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 30, 1994
Shut in
—
Plugged
Jan 15, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 59 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Allen, Red River O-13-26754Wichita County (Special)Waggoner Operating, L.L.C.59427K309Kby Jan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 3,232 · prior 12 3,216(+0%)

0200400202420252026

Gas, mcf lease total

Last 12 months 3,317 · prior 12 4,936(-33%)

05001K202420252026

Wells named Allen Red River

Waggoner Operating L.L.C.'s other wells filed under this lease name in Wichita County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Coda Energy, Inc.Jan 1993 → Aug 1998
  2. 2Belco Energy Corp.Sep 1998 → Jul 2000
  3. 3WG Operating, Inc.Aug 2000 → May 2012
  4. 4Halcon Operating Co., Inc.Jun 2012 → Oct 2013
  5. 5Layline Energy I LLCNov 2013 → Dec 2019
  6. 6Vinland Texas Services LLCJan 2020 → Feb 2024
  7. 7Dara Operating Company, LLCMar 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
428963-99DrillCoda Energy, Inc.Oct 11, 1994Oct 14, 1994Oct 27, 19942,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 30, 1994Allen Red River O-13-26754Wichita County (Special)Waggoner Operating L.L.C.Plugged—

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Megargel Limestone1,692
Thomas Sand1,766

Perforations

Perforated and open-hole intervals.

FromToType
900916Perforated
1,6961,704Perforated
1,7431,746Perforated
1,7661,772Perforated
1,7931,802Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6256412.2550 S
10.759112.570 S
5.51,9967.875425 S
72,1209.5300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 25, 2008Nov 26, 2007—
00Jan 18, 1995Dec 14, 1994Yes
00Dec 20, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48543002, documented in the API reference.