WELL · 42-485-43198 · DISTRICT 9

Overby #26

Plugged

Wichita County · Wichita County Regular field  · Vertical

Overby #26 (API 42-485-43198) is a plugged well in Wichita County, plugged April 13, 2011, last operated by Stone Gregory W..

The RRC has issued one drilling permit, issued April 4, 1996, permitted to 1,200 ft.

Completion filings report one formation top, including Cisco.

Its lease has reported 47.9K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 24 wells, so these are lease totals, not this well alone.

Operator of record

Stone Gregory W.

Based in
Holliday, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
49
Phone
(940) 733-5914

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStone Gregory W.
Production reportsStone, Gregory W.through Apr 2026
Latest permitStone, Gregory W.Apr 4, 1996
1,200
total depth, ft
1
permits on file
Apr 4, 1996
last permit issued
Apr 17, 1996
completed
47.9K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 17, 1996
Shut in
—
Plugged
Apr 13, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Overby O-13-28224Wichita County RegularStone, Gregory W.2447.9K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 561 · prior 12 395(+42%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stone, Gregory W.Jan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446499-99DrillStone, Gregory W.Apr 1, 1996Apr 4, 1996Apr 16, 19961,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-28224————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
CiscoCISCO SERIES860

Perforations

Perforated and open-hole intervals.

FromToType
8601,052Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.51,0527.875220 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 13, 1997Sep 17, 1996—
00Jan 9, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
751K
bbl, all reported
May 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000085296H-1 InjectionPlugged Apr 28, 2011400430860–1,052

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 27,500(-100%)

02K4K20102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48543198, documented in the API reference.