WELL · 42-485-43212 · DISTRICT 9

Waggoner A #1

Plugged

Wichita County · Wichita County Regular field  · Vertical

Waggoner A #1 (API 42-485-43212) is a plugged well in Wichita County, plugged October 16, 1996, last operated by Craighead Ray.

The RRC has issued one drilling permit, issued May 13, 1996, permitted to 2,000 ft.

Completion filings report 2 formation tops, including Cisco, Gunsight.

Operator of record

Craighead Ray

Based in
Wichita Falls, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 2, 1998
Permits on file
32
Phone
(940) 723-5089

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCraighead Ray
Production reportsnone
Latest permitCraighead, RayMay 13, 1996
2,000
total depth, ft
1
permits on file
May 13, 1996
last permit issued
Jun 10, 1996
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Oct 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 10, 1996
Shut in
—
Plugged
Oct 16, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waggoner A O-13-29176Wichita County RegularCraighead, Ray100Jul 1996 – Oct 1996

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
447922-99DrillCraighead, RayMay 8, 1996May 13, 1996Jun 1, 19962,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29176————

Formation tops

As filed on W-2/G-1. Subsea from 1,167 ft elevation.Download CSV →

FormationMD ftSubsea
CiscoCISCO SANDS1,900-733
GunsightGUNSIGHT LIME1,930-763

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.55207.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 9, 1996Jul 12, 1996Yes
00Jul 23, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48543212, documented in the API reference.