TEXAS · WELLS · WICHITA COUNTY · FIRST NATIONAL WATERFLOOD UNIT LEASE · API 42-485-43798 · DISTRICT 7C

First National Waterflood Unit #79

Shut in

Wichita County · K-M-A field · Shut In  · Vertical

Fields on the latest permit · any of 2
K-M-A · Wichita County Regular
Not one formation; the well must be completed in one of them, and no target formation is stated.

First National Waterflood Unit #79 (API 42-485-43798) is a well in Wichita County operated by R2q Operating LLC, completed March 2, 2018 and listed as shut in on the RRC schedule, shut in April 1, 2025.

The RRC has issued one drilling permit, issued October 24, 2003, permitted to 4,030 ft.

It was permitted by Bto Venture, Inc. and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report 9 formation tops, including Megargel Sd, Gs Lime, Gs Sd, Kma Lime.

Its lease has reported 463K barrels of oil and 235K mcf of gas since January 1993, last reporting volume in February 2026. The lease carries 36 wells, so these are lease totals, not this well alone.

Operator of record

R2Q Operating LLC

Permitted by Bto Venture, Inc.; the EWA schedule now lists a different operator.

Based in
Iowa Park, TX
P-5 status
Active – Extension (X)
P-5 last filed
Sep 12, 2025
Permits on file
38
Phone
(940) 228-1500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsR2Q Operating LLCthrough Feb 2026
Latest permitBto Venture, Inc.Oct 24, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,030
total depth, ft
1
permits on file
Oct 24, 2003
last permit issued
Mar 2, 2018
completed
463K
cumulative oil, bbl
235K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 2, 2018
Shut in
Apr 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 36 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
First National Waterflood Unit O-13-12417K-M-AR2Q Operating LLC36463K235KJan 1993 – Feb 2026

Oil, barrels lease total

Last 12 months 2,211 · prior 12 5,936(-63%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bto Venture, Inc.Jan 1993 → Nov 2012
  2. 2Urban Oil & Gas Group, LLCDec 2012 → Dec 2021
  3. 3R2Q Operating LLCJan 2022 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
537783-99DrillBto Venture, Inc.Oct 22, 2003Oct 24, 2003Oct 25, 20034,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 2, 2018First National Waterflood Unit O-13-12417K-M-AR2Q Operating LLCShut In · shut in Apr 1, 20254,030

Formation tops

As filed on W-2/G-1. Subsea from 1,006 ft elevation.Download CSV →

FormationMD ftSubsea
Megargel SD1,658-652
GS Lime1,753-747
GS SD1,770-764
Kma Lime3,651-2,645
Kma Zone I3,729-2,723
Zone I3,729-2,723
Zone II3,810-2,804
Zone III3,854-2,848
Goen Lime3,908-2,902

Perforations

Perforated and open-hole intervals.

FromToType
3,7344,010Perforated
3,9093,921Perforated
3,9263,942Perforated
3,9934,010Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6259112.25100 S
5.54,0297.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 3, 2019Aug 30, 2019—
00Feb 25, 2004Dec 9, 2003Yes
00Feb 5, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48543798, documented in the API reference.