TEXAS · WELLS · WICHITA COUNTY · MCVEIGH, JO "A" LEASE · API 42-485-44597 · DISTRICT 7C

McVeigh JO A #11

Shut in

Wichita County · Wichita County Regular field · Shut In  · Vertical

Mcveigh JO A #11 (API 42-485-44597) is a well in Wichita County operated by R2q Operating LLC, completed January 30, 2009 and listed as shut in on the RRC schedule, shut in August 1, 2017.

The RRC has issued one drilling permit, issued December 30, 2008, permitted to 2,000 ft.

It was permitted by Texas Energy Operations, LC and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 27.9K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

R2Q Operating LLC

Permitted by Texas Energy Operations, LC; the EWA schedule now lists a different operator.

Based in
Iowa Park, TX
P-5 status
Active – Extension (X)
P-5 last filed
Sep 12, 2025
Permits on file
38
Phone
(940) 228-1500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsTexas Energy Operations, LCthrough Jun 2017
Latest permitTexas Energy Operations, LCDec 30, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Dec 30, 2008
last permit issued
Jan 30, 2009
completed
27.9K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 30, 2009
Shut in
Aug 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McVeigh, JO "A" O-13-24122Wichita County RegularR2Q Operating LLC827.9K22Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Abb Oil Co., Inc.Jan 1993 → Aug 2008
  2. 2Texas Energy Operations, LCSep 2008 → Jun 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
676382-99DrillTexas Energy Operations, LCDec 15, 2008Dec 30, 2008Jan 19, 20092,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 30, 2009McVeigh JO A O-13-24122Wichita County RegularR2Q Operating LLCShut In · shut in Aug 1, 20172,000

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsight1,802

Perforations

Perforated and open-hole intervals.

FromToType
1,8021,806Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,9647.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 21, 2014Oct 23, 2012—
00Sep 9, 2009Apr 30, 2009Yes
00Aug 3, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
344K
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104136H-1 InjectionActive4008901,792–1,944

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48544597, documented in the API reference.