WELL · 42-485-45440 · DISTRICT 9

Burns Ellenburger #1005

Y

Wichita County · K-M-A (Ellenburger) field · Partial Plug  · Vertical

Burns Ellenburger #1005 (API 42-485-45440) is a well in Wichita County operated by R2q Operating LLC, completed May 19, 2013 and listed as partial plug on the RRC schedule.

The RRC has issued 2 drilling permits between 2013 and 2014, permitted to 5,000 ft.

It was permitted by Urban Oil & Gas Group, LLC and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including KMA, Goen, Kma (Ellenburger).

Its 2 leases have reported 512K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The leases carry 28 wells, so these are lease totals, not this well alone.

Operator of record

R2Q Operating LLC

Permitted by Urban Oil & Gas Group, LLC; the EWA schedule now lists a different operator.

Based in
Iowa Park, TX
P-5 status
Active – Extension (X)
P-5 last filed
Sep 12, 2025
Permits on file
38
Phone
(940) 228-1500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsR2Q Operating LLCthrough Feb 2026
Latest permitUrban Oil & Gas Group, LLCSep 5, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
2
permits on file
Sep 5, 2014
last permit issued
May 19, 2013
completed
512K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 19, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 28 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burns O-13-6096K-M-AR2Q Operating LLC21512K21Jan 1993 – Jul 2026
Burns Ellenburger O-13-26653K-M-A (Ellenburger)R2Q Operating LLC7240Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 355 · prior 12 1,114(-68%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bto Venture, Inc.Jan 1993 → Nov 2012
  2. 2Urban Oil & Gas Group, LLCDec 2012 → Dec 2021
  3. 3R2Q Operating LLCJan 2022 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
792879-99RecompletionUrban Oil & Gas Group, LLCJul 30, 2014Sep 5, 2014Feb 5, 20144,550
760237-99DrillUrban Oil & Gas Group, LLCApr 8, 2013Apr 22, 2013Apr 24, 20135,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-6096————
—— O-13-26653————

Formation tops

As filed on W-2/G-1. Subsea from 998 ft elevation.Download CSV →

FormationMD ftSubsea
KMA3,550-2,552
Goen3,750-2,752
Kma (Ellenburger)4,020-3,022

Perforations

Perforated and open-hole intervals.

FromToType
3,6463,650Perforated
3,8703,874Perforated
3,8783,882Perforated
3,8863,892Perforated
3,9524,550Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512212.25100 S
5.53,9517.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 16, 2014May 5, 2014—
00Jul 15, 2013Jun 14, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48545440, documented in the API reference.